Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Lake Victoria Gold Update on Exploration of Licences Adjacent to the Tembo Project Acquired by Barrick

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - March 12, 2025) - Lake Victoria Gold (TSXV: LVG) ("LVG", or the "Company") is pleased to provide an update on the Q3 and Q4 2024 exploration activities conducted by Bulyanhulu Gold Mine Limited ("Buly"), a partnership between Barrick Gold Corporation ("Barrick") and the Government of Tanzania, on the licenses LVG sold to Buly in 2022 ("the Project").

Buly continues to advance exploration at the Project, targeting extensions of Bulyanhulu-style mineralization. A combination of aircore drilling (AC), geochemical screening and reverse circulation (RC) drilling has refined target areas, confirming the prospectivity of key geological structures.

Q3 & Q4 2024 Highlights

  • Enze Prospect Development: Aircore geochemical and geological screening continued throughout Q3 and Q4, further developing geological and geochemical signatures that support the potential for Bulyanhulu-style extensions beneath transported regolith.

  • RC Drilling at Ngula & Enze: A new RC drilling program commenced in Q3, targeting potential mineralization associated with 2023 geochemical anomalies at Ngula. Drilling continued into Q4, intersecting mafic units, felsic volcanic tuffs, and argillite at key mafic/tuff contacts.

  • Geological Observations: The drilling campaign successfully confirmed the proposed geological model, characterized by basalt, tuff, and argillite formations along the basalt-tuff contacts, as well as quartz feldspar porphyry intrusions.

  • Structural Indicators: Localized moderate-strong shearing, quartz veins, and up to 1% pyrite were observed, aligning with interpreted geophysical structures, further validating the prospectivity of the project area.

  • Gold Anomalies Identified:

    • Enze Prospect: RC drilling identified gold anomalies within basalts and felsic tuffs along moderate strain zones, supporting further drilling in Q2-Q4 2025.

    • Ngula Prospect: Follow-up RC drilling beneath previously defined geochemical anomalies did not yield significant gold mineralization.

  • Potential for Satellite Deposits: The progression of aircore and geochemical screening in Q4 expanded the geochemical and geological footprint, identifying new targets with potential for additional satellite deposits.

  • Cumulative Project Expenditure: Expenditure to date by Barrick is approximately US$4, 157,000 through the end of Q4-2024, towards the US$9,000,000 expenditure obligation due over the 4-year period.

Q3 & Q4 Drilling Summary

Q3 & Q4 2024 Drilling Statistics

Drilling Type

Total Holes Drilled

Total meters Drilled

AC

1,005

13,217

RC

63

8,091