Kirkland Lake Gold Reports New Discoveries and Extensions to Mineralization at the Taylor Gold Mine Complex

TORONTO, ONTARIO--(Marketwired - Jan 30, 2017) - Kirkland Lake Gold Ltd. ("KL Gold" or the "Company") (KL.TO)(KLGDF) is pleased to report new exploration drill results from surface and underground drilling at its Taylor Gold Mine Complex ("Taylor") located in Northeastern Ontario; situated along the prolific Porcupine Destor Fault (the "PDF") which is host to numerous gold deposits. The Company controls an extensive land package extending approximately 120 km along the PDF, a portion of which hosts Taylor. At Taylor, the Company has currently identified three major mineralized deposits along the PDF which include: (i) the West Porphyry Deposit (the "WPZ"') which contains the majority of the Mineral Resource and Mineral Reserve estimates in the middle of the property and where active mining currently takes place; (ii) the Shoot Deposit located to the west of the property; and (iii) the Shaft Deposit located on the eastern side. (see Figure 1 and 2 below).

All drilling targeted new mineralized extensions situated both at depth and along strike to the east of the Shaft Deposit and west of the WPZ, which includes the 1003, 1004, and 1008 Zones. (See Tables 1 and 2 below.) Highlights from the surface and underground drill program include:

Surface Drilling West of WPZ (See Figure 3)

  • Drilling from surface approximately 300 m from the edge of known mineralization at the WPZ Deposit intersected 10.31 g/t Au over 3.2 m in hole TA16-001 and 13.91 g/t Au over 1.5 m (12.74 g/t Au cut) in hole TA16-005. Follow up drilling is underway with two surface diamond drill rigs.

Underground Exploration Drilling Outside of WPZ Near 1004 and 1003 Zones (See Figure 3)

  • 9.50 g/t Au over 4.5 m in hole T160-017 up-dip of the 1004 Zone.

  • 7.78 g/t Au over 3.4 m in hole T450-008 and 15.03 g/t Au over 1.3 m in hole T450-019, demonstrating good potential to expand Mineral Resources and remains open in all directions.

  • 39.62 g/t Au over 1.1 m including 85.0 g/t Au(1) over 0.5 m in hole T450-012, located 330 m down-dip of existing development, providing a suitable target for 2017 drill follow up.

Surface Drilling East of Shaft Deposit Reporting Newly Discovered Area of Mineralization (See Figure 4)

  • 3.29 g/t Au over 9.6 m and 4.59 g/t Au over 5.8 m in hole TA16-008, mineralization remains open at depth.

  • 2.35 g/t Au over 11.0 m including 3.96 g/t Au over 3.0 m in hole TA16-019, open along strike to the east and at depth.

Reported intercepts are core lengths, with higher grade assays cut to 30 g/t Au. True widths have not been determined at this time. See Tables 1 and 2 below for detailed information regarding both the surface and underground assay results.