Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Kalo Gold Provides 2025 Exploration and Operational Update
ACCESS Newswire · Kalo Gold Corp.

In This Article:

VANCOUVER, BC / ACCESS Newswire / March 17, 2025 / KALO GOLD CORP. (TSXV:KALO) ("Kalo", "Kalo Gold" or the "Company") is pleased to provide a key update on the Company's upcoming activities at our flagship Vatu Aurum Gold Project in Fiji. Over the past several months, the Company has made significant strides in identifying a highly prospective, fully preserved and vertically intact epithermal gold system across the Aurum Epithermal Field. Field and geochemical data suggest geological similarities to certain Pacific Rim deposits, including the Martha Mine in New Zealand, underscoring our confidence in the Project's district-scale potential.

9,000-METER DIAMOND DRILLING PROGRAM

  • Initial Focus - Namalau Trend: Drilling, expected to commence in April 2025, will initially focus on eight high-priority upwelling zones along the Namalau Trend.

  • Advancing Other Targets: As new information emerges from concurrent trenching and geological work, the campaign will expand to test additional epithermal upwelling zones in the Loma and Buca Trends.

  • Qiriyaga Complex Drilling: We are also planning further drilling at the Qiriyaga Complex, targeting high-grade diatreme and surge deposits that have emerged as priority zones.

  • Fully Preserved, Untested System: Our geological modeling suggests that Vatu Aurum hosts a vertically intact epithermal system-largely untested by drilling-offering an exceptional discovery opportunity.

UNLOCKING DISTRICT-SCALE POTENTIAL

Preliminary data from the Namalau Trend, as well as the Loma and Buca corridors, reveal epithermal indicators such as elevated selenium, arsenic, mercury, and antimony, strengthen the case for a vertically intact gold system at Vatu Aurum. While references to other deposits (e.g., Martha Mine, Vatukoula, Lihir) are for geological comparison only, their similarities help guide our exploration model and highlight the scale we believe is possible. Any comparisons to other mines are purely for geological context and should not be interpreted as indicative of our project's potential size, grade, or economic viability.

"From the preserved surface sinters in the Namalau Trend to the newly revealed upwelling zones in the Loma and Buca corridors, this 9,000-meter drill campaign marks a pivotal step in realizing the full potential of the Vatu Aurum Project. We look forward to sharing each milestone and discovery as we build towards what we believe could be a game-changing, district-scale gold deposit."-Terry L. Tucker, P.Geo., President & CEO