Jourdan Completes Phase 2 of its 2022 Drilling Program

In This Article:

Jourdan Resources Inc.
Jourdan Resources Inc.

Figure 1

The Vallée property is immediately east of the North American Lithium mine. This figure depicts the 2011, 2021 and 2022 completed drillholes. All 26 drillholes since 2021 have intersected the li-bearing, spodumen-rich pegmatite swarm.
The Vallée property is immediately east of the North American Lithium mine. This figure depicts the 2011, 2021 and 2022 completed drillholes. All 26 drillholes since 2021 have intersected the li-bearing, spodumen-rich pegmatite swarm.

All eighteen holes of its 2022 winter drilling campaign have intersected the new spodumene-bearing pegmatite swarm.

TORONTO, May 24, 2022 (GLOBE NEWSWIRE) -- JOURDAN RESOURCES INC. (TSXV: JOR; OTCQB: JORF, FRA:2JR1) (“Jourdan” or the “Company“) is pleased to announce that all of its eighteen (18) drill holes of its 2022 winter drilling campaign have intersected the new spodumene-bearing pegmatite swarm on its Vallée property at a previously underexplored eastern extension, which had not been exposed by the North American Lithium mine to the west of Vallée (see Fig. 1).

Jourdan is pleased to advise that phase 2 of the 2022 drilling has been completed. 18 holes were drilled with a total of 3,629 metres of core. This core is now scheduled to be logged, cut, sampled, and then sent to the assay laboratory for the establishment of lithium contents. The results of the drilling and assaying are expected to be utilized in the already initiated initial resource estimation process.

Since restarting drilling in September 2021, Jourdan has drilled twenty-six drillholes; all 26 have intercepted multiple spodumene-bearing pegmatite dykes.

Jourdan’s Executive Chairman, Dr. Andreas Rompel, stated, “We have successfully completed another phase in our endeavour to enlarge the known deposit size on our Vallée project. We are now keenly awaiting the assay results so that we can start the initial resource estimation process. Of the 47 holes drilled since 2011, we have selected the results from 37 to be used in estimating our first initial resource. We are satisfied that this will be sufficient for an inferred resource. Nevertheless, since more funds are available, we may continue to drill later in 2022 to further expand the known deposit size, taking recommendations of our resource estimator to upgrade the anticipated initial resource into account.”

The now completed drill program was conducted by Forage Hébert from Amos, Quebec, under the supervision of Alex Belo, Géologue Inc. (ABG Exploration) of Laval, Quebec.

Figure 1: The Vallée property is immediately east of the North American Lithium mine. This figure depicts the 2011, 2021 and 2022 completed drillholes. All 26 drillholes since 2021 have intersected the li-bearing, spodumen-rich pegmatite swarm.
https://www.globenewswire.com/NewsRoom/AttachmentNg/8d3e2071-e61d-4edc-8468-7a3570c91f30

Drillhole

Description*

 

VAL22-5-4

5 interceptions of 1 to 3m spodumene bearing pegmatite dyke.

 

VAL22-5-5

4 interceptions of 1 to 3m spodumene bearing pegmatite dyke.

 

* Drill core width only, does not represent true width.