Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Inventus Mining Reports Positive Initial Drill Results Demonstrating Lateral Continuity of Gold Mineralization Within 18 Metres of Surface at the Pardo Gold Project

In This Article:

Inventus Mining Corp.
Inventus Mining Corp.

Highlights

  • Results from the first 24 holes of our 80-hole drill program demonstrate lateral continuity of gold within 18 metres of surface

  • 4.6 gpt gold over 2.43 metres including 21.2 gpt gold over 0.46 metres

  • 3.5 gpt gold over 3.17 metres including 11.9 gpt gold over 0.50 metres

  • 3.1 gpt gold over 2.00 metres including 10.6 gpt gold over 0.50 metres

  • 3.6 gpt gold over 1.50 metres including 6.4 gpt gold over 0.50 metres

TORONTO, Feb. 13, 2025 (GLOBE NEWSWIRE) -- Inventus Mining Corp. (TSXV: IVS) (“Inventus” or the “Company”) is pleased to announce initial drill results from its Phase 1 Resource Drill Program at the 100%-owned Pardo Gold Project located 65 km east of Sudbury, Ontario.

The first 24 holes of an 80-hole shallow drill program have been received and are in line with expectations. The holes were targeting a laterally extensive flat lying zone of mineralization that averages approximately 2 metres thick and occurs within 18 metres of the surface. The results of these Initial 24 holes have demonstrated continuity of gold mineralization laterally between holes with reduced variability of grade compared to previous drilling. A full list of results is provided in Table 1, and maps of the hole locations are provided in Figures 1 and 2.

To date all holes have been reviewed, logged and sampled. Initial turnaround times were prolonged due to the large sample size of the PQ core and laboratory preparation procedures had to be modified to ensure the accuracy of results. Results for the remaining 56 holes should be received more quickly. Final results for the program are expected in March.

The Pardo Gold Project benefits from year-round access and features flat-lying, shallow gold mineralization that presents potential for quick start up low-cost surface mining in close proximity to Sudbury, a renowned global mining hub. The objective of the 80-hole resource drill program is to systematically sample areas of shallow gold mineralization providing adequate data to support a future mineral resource estimate. The company intends to outline cheaply defined ounces, which could be mined under the company’s existing 50,000-tonne bulk sampling permit.

Table 1. Drilling Assay Highlights

Drill Hole1

From
(metres)

To
(metres)

Interval2
(metres)

Gold Grade
(gpt)

PD-24-37

10.63

12.46

1.83

0.9

Including

12.00

12.46

0.46

2.2

PD-24-67

9.80

11.30

1.50

0.1

PD-24-17

10.15

13.32

3.17

3.5

Including

10.15

10.65

0.50

11.9

And including

12.82

13.32

0.50

6.7

PD-24-72A

13.89

15.88

1.99

1.2

Including

14.88

15.38

0.50

2.1

PD-24-69

16.00

17.50

1.50

3.6

Including

16.50

17.00

0.5

6.4

PD-24-38

10.05

11.50

1.45

0.9

Including

11.00

11.50

0.5

1.6

PD-24-39

9.72

12.16

2.44

0.8

Including

11.33

12.16

0.83

1.8

PD-24-35

9.90

10.5

0.60

0.3

PD-24-71

14.42

15.65

1.23

2.1

Including

15.21

15.65

0.44

4.8

PD-24-19

15.83

16.75

0.92

2.6

Including

16.28

16.75

0.47

4.7

PD-24-11

12.19

13.30

1.11

0.3

PD-24-13

9.74

11.28

1.54

1.3

Including

9.74

10.26

0.52

2.8

PD-24-16

10.30

12.37

2.07

0.6

Including

11.86

12.37

0.51

1.4

PD-24-77

4.20

6.12

1.92

0.6

Including

4.20

4.70

0.50

1.6

PD-24-02

5.03

8.14

3.11

1.3

Including

5.03

6.50

1.50

2.3

Including

5.49

5.99

0.50

4.2

PD-24-52

0

2.66

2.66

0.3

PD-24-12

9.25

11.25

2.00

3.1

Including

9.75

10.25

0.50

10.6

PD-24-01

3.53

5.27

1.74

0.8

PD-24-48

0

1.45

1.45

1.7

Including

0

0.50

0.50

3.2

PD-24-83

3.62

5.44

1.82

1.6

Including

4.56

4.94

0.38

6.3

PD-24-70

15.00

16.39

1.39

3.4

Including

15.51

16.39

0.88

5.4

Including

15.93

16.39

0.46

6.8

PD-24-53

0.50

2.46

1.96

1.6

Including

1.50

2.46

0.96

2.9

Including

1.50

1.96

0.46

5.0

PD-24-08

9.00

10.90

1.90

1.1

PD-24-05

7.67

10.10

2.43

4.6

Including

9.16

10.10

0.94

11.5

Including

9.64

10.10

0.46

21.2

1Holes are reported in the sequence that they were drilled and sampled.
2Interval width is approximate true thickness. Mineralization has a flat to 5-degree dip and all holes were drilled vertically with an inclination of -90 degrees.