Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Impact Silver Intersects 14.13% Zinc over 2.2m Including 26.06% Zinc over 0.9m at the Plomosas Mine

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - January 16, 2025) - IMPACT Silver Corp. (TSXV: IPT) (OTCQB: ISVLF) (FSE: X9X) ("IMPACT" or the "Company") is pleased to announce further results from an ongoing drill program in the Juarez Mine area of its Plomosas zinc (-lead-silver) Mine in northern Mexico.

HIGHLIGHTS

  • Recent underground drill results in the Juarez Mine area include:

    • Drill hole UGMJ-2420 intersected a high-grade interval grading 14.13% zinc, 1.59% lead and 12 g/t silver over 2.2 metres true width including a very high-grade section grading 26.06% zinc, 3.02% lead and 23 g/t silver over 0.9 metres true width.

    • Drill hole UGMJ-2415 intersected a very high-grade interval of 30.1% zinc over 1.2 metres true width.

    • Drill hole UGMJ-2422 intersected a very high-grade interval of 30.1% zinc over 1.1 metres true width.

  • The Juarez Mine Zone remains open for exploration and drilling is continuing.

Highlights of drill intersections from the Juarez Mine area are as follows:

TABLE 1: PLOMOSAS DRILL RESULTS - JUAREZ MINE AREA

Hole No.

From (metres)

To (metres)

Interval (metres)

Estimated True Width (metres)

Zinc (%)

Lead (%)

Silver (g/t)

UGMJ-2410

30.50

43.95

13.45

1.7

6.26

2.63

11

Including

30.50

33.75

3.25

0.4

15.94

6.81

26

UGMJ-2415

34.05

35.75

1.70

1.2

30.10

2.66

19

And

65.00

66.77

1.77

0.4

18.91

0.08

13

And

78.68

80.18

1.50

1.2

10.25

5.43

26

UGMJ-2417

76.95

80.90

3.95

1.0

16.08

0.07

10

Including

76.95

78.25

1.30

0.3

24.30

0.07

11

UGMJ-2420

33.50

43.75

10.25

2.2

14.13

1.59

12

Including

35.00

39.25

4.25

0.9

26.06

3.02

23

UGMJ-2421

23.55

24.42

0.87

0.6

17.65

8.95

25

UGMJ-2422

21.78

23.35

1.57

1.1

30.10

10.15

40

 

True width estimates are interpreted from current geological models. The Juarez Mine area lies stratigraphically below the Mina Vieja (Tres Amigos Mine) horizon and a separate access to this nearby area is now being developed from the historic Juarez Mine adit at surface (see Figure 2). Other holes in the Juarez Mine area intersected lower grades or narrower intervals. All these Juarez Mine area drill holes lie outside the JORC mineral resource blocks published by the previous operator (see IMPACT news release dated April 3, 2023 for details). Juarez Mine area mineralization remains open for exploration in all directions and drilling is continuing.

CEO STATEMENT

President and CEO Frederick Davidson commented, "We are encouraged with the great results from the Juarez Mine area which represents a second mineralized horizon open in all directions for mining and exploration. This is located close to the Tres Amigos Zone where we are currently mining and our mining team has already begun underground development work from the historic Juarez Mine adit at surface to begin mining there. On the production side, we continue to ramp up operations with the aim to reach mill design capacity in H1/2025."