Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Imagine Lithium Intersects 11.50 m of 1.08% Li2O and 8.80 m of 0.81% Li2O at Casino Royale and Makes New Pegmatite Dike Discovery

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - January 15, 2025) - IMAGINE LITHIUM INC. (TSXV: ILI) (OTCQB: ARXRF) (the "Company" or "Imagine") is pleased to report the results of the fall 2024 diamond drill program and the 2024 field season, including the discovery of a new lithium pegmatite dike north of Casino Royale Zone. The Jackpot lithium project is in the Georgia Lake Pegmatite Field, approximately 140 km northeast of Thunder Bay, Ontario (Figure 1). The Jackpot property is characterized by swarms of mineralized lithium-bearing granitic pegmatite dikes distributed over at least five zones on an 18,800 ha land package (Figure 2).

Highlights of the fall drill program and 2024 field season include:

Casino Royale Zone:

- 1.08% Li2O over 11.50 m from 64.70 m in hole JP-24-42

- Including 1.46% Li2O over 8.00 m from 66.70 m

- 0.81% Li2O over 8.80 m from 103.00 m in hole JP-24-42

- Including 1.14% Li2O over 5.05 m from 103.95 m

New Discovery (500 Zone Extension):

- 1.61% Li2O over 7.80 m from channel sample CH24-01

- 1.96% Li2O and 2.08% Li2O in surface grab samples that bookend an east-west trending, spodumene pegmatite dike that is exposed in outcrop over 480 m, north of the Casino Royale Zone

The 2024 field season included geological and structural mapping, prospecting, soil sampling, and a biogeochemical survey on the project. Geological mapping covered approximately 2,100 ha and a total of 127 surface grab samples, 908 soil samples, and 499 biogeochemical spruce tip samples were collected on the project.

J.C. St-Amour, President of Imagine, commented: "The fall drill program at Casino Royale and the discovery of a new spodumene pegmatite extension of the 500 Zone continue to demonstrate the expansion potential for lithium resources at the Jackpot Project. Imagine is in an excellent position to build on our 3.1 Mt indicated and 5.3 Mt inferred (grading 0.85% and 0.91% Li2O, respectively) Mineral Resource inventory on the project. The results of the 2024 field season have provided new pegmatite targets which are untested and highlighted areas for focussed exploration activities in 2025. With nearby infrastructure and ports, the Project's proximity to a skilled workforce is a major advantage to putting Ontario's first lithium deposit into production."

Figure 1: Jackpot property located next to Trans-Canada Highway, power, port, railroad, and workforce.

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/2962/237281_665c83dbd4779960_001full.jpg