Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Helium Evolution Provides Encouraging Preliminary Update on 10-36 Well

In This Article:

Helium Evolution Incorporated
Helium Evolution Incorporated

CALGARY, Alberta, Feb. 10, 2025 (GLOBE NEWSWIRE) -- Helium Evolution Incorporated (TSXV:HEVI) ("HEVI" or the "Company"), a Canadian-based helium exploration company focused on developing assets in southern Saskatchewan, is pleased to announce preliminary test results from its 10-36-3-9W3 helium discovery well (the “10-36 Well”) along the Mankota helium fairway. HEVI holds a 20% working interest in the 10-36 Well, in partnership with the operator, North American Helium Inc. (“NAH”).

10-36 Well Preliminary Test Results

Completion, perforation and initial production testing of the 10-36 Well are ongoing. After an extended 5-day flow testing period, the 10-36 Well was producing approximately 11.5 million standard cubic feet per day (“MMscf/d”) at 13,100 kiloPascal (“kPa”) flowing tubing pressure. The preliminary test results also confirmed a helium content of 0.81%, significantly higher than the commercially viable threshold of 0.3%. Furthermore, the 10-36 Well produced negligible water, signaling strong potential for efficient helium recovery and processing.

Following the extended production flow period, the 10-36 Well will be shut in for 14 days to gather reservoir pressure data. This data will be analyzed to further evaluate the resource potential and optimize future development.

Picture1
Picture1


Flow Test Results from Select HEVI Wells:

Well

Bottom
Hole
Pressure
(kPa)

Bottom Hole
Temperature
(°C)

Helium
Content

Rate
(MMscf/d)

Tubing
Pressure
(kPa)

Water

10-36 Well (Preliminary)1

23,600

78

0.81%

11.5

13,100

Negligible

10-1 Well2

24,069

78

0.75%

9.5

10,800

Negligible

9-35 Well3

23,928

81

0.64%

7.0

9,000

Negligible

2-31 Well4

24,189

81

0.95%

4.0

5,500

Negligible

1 The 10-36 Well preliminary results are subject to further analysis.
2 Well located at 10-1-4-9W3 (the “10-1 Well”)
3 Well located at 9-35-3-9W3 (the “9-35 Well”)
4 Well located at 2-31-2-8W3 (the “2-31 Well”)

Looking Ahead

HEVI continues to work closely with NAH to plan the next phase of development. With three helium discovery wells in close proximity to one another, NAH is evaluating the feasibility of installing processing facilities in the area, pending the results of well at 5-30-3-8W3 (the “5-30 Well”). HEVI fully supports this initiative, as the establishment of processing facilities is a crucial step in HEVI’s strategy to transition toward commercial helium production.

Stay Connected to Helium Evolution

Shareholders and other parties interested in learning more about the Helium Evolution opportunity are encouraged to visit the Company’s website, which includes an updated corporate presentation, and are invited to follow the Company on LinkedIn and X for ongoing corporate updates and helium industry information. Helium Evolution also provides an extensive, commissioned ‘deep-dive’ research report prepared by a third party whose background includes serving as a research analyst for several bank-owned and independent investment dealers.