GSP Discovers New High-Grade Gold Zone at Alwin Mine Property Assaying 5.04 g/t Gold and 1.01% Copper Over 7.90m; Including 22.93 g/t Gold and 1.82% Copper Over 1.64m

In This Article:

VANCOUVER, BRITISH COLUMBIA - January 16, 2025 (NEWMEDIAWIRE) - GSP Resource Corp. (TSX-V: GSPR / FSE: 0YD / OTC: GSRCF) (the "Company" or "GSP") announces the results for the remaining 6 diamond drill holes from its 7 hole 2024 drill campaign totaling 812 metres designed to target potential extensions of known high-grade copper and gold zones at the Alwin Property located in the Highland Valley Copper Camp of British Columbia. The Alwin Project hosts current inferred mineral resources comprising 1.46 million tonnes (Mt) tonnes, at an average grade of 1.08% copper (Cu), yielding 34.6 million pounds of Cu1.

The drill results reported today include the discovery of a new high-grade gold zone within drill hole AM-24-06 grading 5.04 grams-per-tonne (g/t) gold (Au) and 1.01% copper (Cu) over 7.90 m, including 22.93 g/t Au and 1.82% Cu over 1.64 m; in addition to an upper zone grading 1.22% Cu, 22.5 g/t Ag and 0.64 g/t Au over 2.5 m (Figure 1 and Table 1).

AM-24-06 was collared south of the Alwin Mine upper decline entrance and was designed to test for the extension of mineralization to the northwest and below the current mineral resource pit shell in an area with limited historic drilling. AM-24-06 intersected a zone of high-grade gold mineralization, which included a single 0.84 m sample that assayed 35.1 g/t Au (1.02 oz/ton) (sample L645413 from 157.36-158.20 m), below the vertical projection of "3 Zone" mineral resources, approximately 40 m below the pit shell, and 120 m vertically from surface. The results point to the presence of a unique high-grade gold subset of mineralization at Alwin that is currently not well understood.

Drill hole AM-24-05 targeting the eastern untested near surface projection of the high-grade "4 Zone", that was historically exploited on multiple underground sublevels, intersected a high-grade copper zone yielding 3.93% Cu, 6 g/t Ag, and 0.10 g/t Au over 4.78 m (Figure 2 and Table 1). The AM-24-05 results confirm the near surface eastern strike extent strength of the 4 Zone and demonstrate future within-pit resource expansion opportunities.

Simon Dyakowski, CEO of GSP commented, "With the discovery of a new zone of high-grade gold mineralization at the Alwin Mine Project, we have delivered on the key goal of the Company's 2024 drill campaign. The results reported today have yielded the highest-grade modern gold assay interval at Alwin drilled to-date. These results could be transformational for the Project and point to the need to further evaluate the spatial distribution of gold-primary zones of mineralization, given their significant mineral resource upside potential alongside the well-established copper mineralization."