Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Greenland Resources Provides Update on Capex

In This Article:

TORONTO, July 15, 2024--(BUSINESS WIRE)--Greenland Resources Inc. (Cboe CA: MOLY | FSE: M0LY) ("Greenland Resources" or the "Company") is pleased to announce that further to its press release dated June 11, 2024 on the exploitation license update, the Company and its financial advisors, Endeavour Financial, entered into a new phase with numerous prospective financiers of the debt portion of the capex, including the AAA and AA credit rated export credit agencies and commercial banks that already provided letters of intent to the Company. In addition, the independent engineering firm Tetra Tech completed a positive United Nations Framework Classification for Resources ("UNFC") report for the Malmbjerg project, a document required by various European sovereign funds that the Company is engaging with that invest in equity. The UNFC is a classification system for defining the environmental-socio-economic viability and technical feasibility of raw material projects. Updates will be provided in due course.

Greenland Resources Inc.

Greenland Resources is a Canadian public company with the Ontario Securities Commission as its principal regulator and is focused on the development of its 100% owned Climax type primary molybdenum deposit located in central east Greenland. The Malmbjerg molybdenum project is an open pit operation with an environmentally friendly mine design focused on reduced water usage, low aquatic disturbance and low footprint due to modularized infrastructure. The Malmbjerg project benefits from an NI 43-101 Definitive Feasibility Study completed by Tetra Tech in 2022, with an US$820 million capex and a levered after-tax IRR of 33.8% and payback of 2.4 years, using US$18 per pound molybdenum price. The Proven and Probable Reserves are 245 million tonnes at 0.176% MoS2, for 571 million pounds of contained molybdenum metal. As the high-grade molybdenum is mined for the first half of the mine life, the average annual production for years one to ten is 32.8 million pounds per year of contained molybdenum metal at an average grade of 0.23% MoS2, approximately 25% of EU total yearly consumption. The project had a previous exploitation license granted in 2009. With offices in Toronto, the Company is led by a management team with an extensive track record in the mining industry and capital markets. For further details, please refer to our web site (www.greenlandresources.ca) and our Canadian regulatory filings on Greenland Resources’ profile at www.sedarplus.com.

The Project is supported by the European Raw Materials Alliance (ERMA). ERMA is managed by EIT RawMaterials, an organization within the EIT, a body of the European Union.