Graphano Intersects 6.12% Graphite Over 9 Metres at 100% Owned LAB Graphite Project

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - June 9, 2022) -  Graphano Energy Ltd. (TSXV: GEL) (OTCQB: GELEF) (FSE: 97G0) ("Graphano Energy" or the "Company") is pleased to announce results from Zone 1 on its 100% owned Lac Aux Bouleaux Graphite Property (the "LAB Property", "LAB" or the "Property") in Quebec. The LAB Property is located contiguous to the Lac-del- Iles graphite mine and covers the immediate southern extension of the productive graphite horizons. Fourteen drill holes totaling 1,275 metres were completed on the Zone 1 target. Highlights are provided below.

Highlights (see Table 1 for details):

  • Drill Hole LB22-18 intersected 6.0% graphitic carbon (Cg) over 6 metres at 65 metre (m) drilled depth;

  • Drill Hole LB22-21 intersected 4.58% Cg over 9.8 m at 95.2 m drilled depth

  • Drill Hole LB22-22 intersected 7.04% Cg over 5.8 m at 102.2 m drilled depth;

  • Drill Hole LB22-23 intersected three zones as follows:

  • Top zone of 4.17% Cg over 3.0 m at 14.0 m;

  • Middle zone of 5.82% Cg over 5.0 m at 36.0 m; and

  • Lower zone of 3.97% Cg over 2.0 m at 86.0 m.

  • Drill Hole LB22-24 intersected three zones as follows:

  • Top zone of 6.12% Cg over 9.0 m at 43.5 m; and

  • Middle zone of 4.81% Cg over 2.0 m at 84.0 m;

  • Lower zone of 6.09% Cg over 6.0 m at 90.0 m.

  • Drill Hole LB22-26 intersected minimum of 5.29% Cg over 9.0 m at 23.9 m drilled depth, including 7.51% Cg over 5.0 m

(Note: All intersections reported are based on drilled width. True width will be defined with additional drilling.)

Luisa Moreno, Chief Executive Officer of the Company, stated: "We are very encouraged with the drill results from Zone 1 and previously released results from Zone 4 to the southwest. They are consistent with Lac-del-Iles grades which is the only producing graphite mine in North America. Additional work will continue on the Property and we are confident in proving up graphite resources, positioning Graphano as a potential near term producer."

Table 1: Drill hole results

LAB Graphite Project

Zone 1 - 2022 Exploration Drilling

Hole No.

Azimuth

Dip

Easting

Northing

From (m)

To (m)

Interval A1 (m)

% Cg

LB22-16

110.83

-42.42

458715

5134398

25.79

29.50

3.71

7.20

LB22-17

168.46

-40.21

458715

5134397

29.00

33.00

4.00

8.15

LB22-18

127.86

-46.78

458720

5134443

65.00

71.00

6.00

6.00

LB22-19

115.47

-44.01

458781

5134606

27.48

28.50

1.02

5.66

LB22-20

125.24

-43.22

458841

5134611

25.00

26.36

1.36

6.98

LB22-21

139.37

-44.66

458899

5134633

95.20

105.00

9.80

4.58

LB22-22

136.41

-44.88

458935

5134660

26.00

27.00

1.00

4.40

90.00

91.80

1.80

6.76

102.20

108.00

5.80

7.04

LB22-23

126.11

-44.8

458988

5134708

14.00

17.00

3.00

4.17

36.00

41.00

5.00

5.82

86.00

88.00

2.00

3.97

LB22-24

94.17

-44.27

458988

5134708

22.00

23.00

1.00

3.40

43.50

52.50

9.00

6.12

including

43.50

47.70

4.20

8.41

and

49.75

51.50

1.75

8.32

84.00

86.00

2.00

4.81

90.00

96.00

6.00

6.09

including

91.00

95.00

4.00

7.71

LB22-25

141.4

-43.22

458975

5134612

30.00

31.00

1.00

6.29

57.75

58.40

0.65

7.73

66.00

67.00

1.00

4.52

LB22-26

112.4

-41.47

458947

5134556

23.90

24.70

0.80

8.82

note

23.90

33.00

9.10

5.29 A2

including

27.85

33.00

5.15

7.51

LB22-27

141.99

-38.74

458859

5134492

18.00

23.00

5.00

3.03

LB22-28

127.96

-44.27

458813

5134444

18.00

18.50

0.50

3.78

LB22-29

345.75

-40.08

458635

5134326

38.00

39.00

1.00

13.20