Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Goldshore Intersects 20.55m of 2.58 g/t Au Down Dip on the Southwest Zone: Extends Mineralization 150 Meters Below the Conceptual Open Pit Resource

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - February 20, 2025) - Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) ("Goldshore" or the "Company"), is pleased to announce its latest assay results from its ongoing 15,000 meter drill program at the Moss Gold Project in Northwest Ontario, Canada (the "Moss Gold Project"). The primary goals of the winter drill program are to add to the current resource model by extending mineralization from depth into the top 100-200 meters from surface within the conceptual open pit and to demonstrate the potential for resource growth outside of the current mineral resource estimate.

Michael Henrichsen, CEO of Goldshore, commented, "We are pleased with the latest batch of drill results which clearly demonstrate the potential for resource expansion at higher grades in the southwest area of the Moss deposit. These results are exactly what we were anticipating to drive growth and demonstrate the true potential of the deposit moving forward. We look forward to sharing additional results from the winter drill program and regional exploration program in the coming weeks and months."

Highlights

  • Results from hole MMD-24-139 extended gold mineralization with increased grades 150 meters below the conceptual open pit resource at the southwest end of the Moss deposit with intercepts of:

  • Hole MMD-24-139 also confirmed mineralized shears on the southeast flank of the Southwest Zone extending known mineralization toward surface and encountering new mineralized shear zones with intercepts of:

  • Holes MMD-24-135, MMD-24-138, and MMD-24-139 also extended numerous mineralized shears toward surface in the Southwest Zone with intercepts of:

Technical Overview

Figure 1 shows the location of the drill holes being reported with respect to the planned winter drill program, while Figure 2 illustrates a cross section through drill hole MMD-24-139 that demonstrates significant mineralization above and below the current mineral resource. Tables 1 & 2 summarize significant intercepts and drill hole locations, respectively.

Figure 1: Illustrates the 2025 ongoing winter drill program targeting resource expansion within the conceptual open pit outlined in grey. Drill holes being reported are highlighted in red.

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/8051/241613_goldshore1en.jpg

Figure 2: Drill section through MMD-24-139 illustrating a wider series of shears near surface that will allow the Company to model grade to surface. The section also highlights the growth potential beneath the open pit that may enable the open-pit resource to be as deep as the Main-QES pit