Goldshore Intercepts 2.65 g/t Au over 14.6m in 200 m Step-Out Hole at Moss Lake

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - August 10, 2022) - Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) ("Goldshore" or the "Company"), is pleased to announce assay results from its ongoing 100,000-meter drill program at the Moss Lake Project in Northwest Ontario, Canada (the "Moss Lake Gold Project").

Highlights:

  • Four holes drilled to evaluate the eastern extension of the Southwest Zone have confirmed gold mineralization within anastomosing shears in altered diorite with intercepts of:

    • 39.75m @ 1.18 g/t Au from 44.25m depth in MMD-22-023, including

      • 14.60m @ 2.65 g/t Au from 462.2m 

    • 11.65m @ 1.05 g/t Au from 37.35m depth, and

    • 18.70m @ 1.37 g/t Au from 151.1m in MMD-22-031

    • 10.00m @ 1.05 g/t Au from 290.0m in MMD-22-035

President and CEO Brett Richards stated: "We are excited to continue to deliver consistent drilling results. I am encouraged about the high-grade sections we are seeing and have shared previously with the market, as this will provide optionality when we model the resource later in the year and start to look at economic pit shells. With this step out hole from historically drilled areas at Moss Lake, it will further increase the optionality."

Technical Overview

Table 1 shows the significant intercepts. Table 2 and Figure 1 show the drill hole locations.

Table 1: Significant downhole gold intercept

HOLE ID

FROM

TO


LENGTH
(m)
 

TRUE
WIDTH (m)


CUT
GRADE 
(g/t Au)


UNCUT
GRADE 
(g/t Au)

MMD-22-023

375.95

379.30

3.35

2.5

0.37

0.37

440.25

502.10

61.85

49.4

0.84

0.88

Including

440.25

480.00

39.75

31.7

1.18

1.24

Including

462.20

476.80

14.60

11.7

2.65

2.83

and

490.35

502.10

11.75

9.6

0.32

0.32

527.00

529.00

2.00

1.7

0.36

0.36

565.40

584.35

18.95

16.2

0.32

0.32

 

 

 

 

 

 

 

MMD-22-027

22.80

28.00

5.20

3.3

0.76

0.76

42.00

48.00

6.00

3.9

0.54

0.54

58.60

82.00

23.40

15.7

0.37

0.37

95.10

220.00

124.90

91.3

0.48

0.48

including

171.50

175.45

3.95

2.9

2.60

2.60

and

207.00

210.65

3.65

2.8

3.26

3.26

260.00

262.70

2.70

2.2

0.46

0.46

305.65

314.00

8.35

6.9

0.42

0.42

336.10

351.20

15.10

12.9

0.47

0.47

375.15

379.55

4.40

3.9

0.32

0.32

386.00

394.00

8.00

7.1

0.56

0.56

 

 

 

 

 

 

 

MMD-22-031

15.50

64.30

48.80

33.3

0.61

0.61

including

25.00

29.00

4.00

2.7

1.43

1.43

and

37.35

49.00

11.65

7.9

1.05

1.05

74.45

80.00

5.55

3.9

1.76

1.76

91.95

174.45

82.50

60.3

0.66

0.66

including

106.80

112.80

6.00

4.3

1.30

1.30

and

151.10

169.80

18.70

13.9

1.37

1.37

193.00

200.00

7.00

5.4

0.38

0.38

212.00

231.60

19.60

15.4

0.37

0.37

including

214.00

216.00

2.00

1.6

1.91

1.91

273.00

275.10

2.10

1.7

0.49

0.49

 

 

 

 

 

 

 

MMD-22-035

83.30

87.00

3.70

2.5

0.38

0.38

92.00

111.00

19.00

13.0

0.49

0.49

135.80

138.00

2.20

1.5

0.61

0.61

156.00

166.00

10.00

7.3

0.56

0.56

184.75

322.40

137.65

109.9

0.37

0.37

including

196.00

201.00

5.00

3.8

1.30

1.30

and

290.00

300.00

10.00

8.3

1.05

1.05

332.85

355.55

22.70

19.7

0.47

0.47

including

332.85

338.00

5.15

4.4

1.37

1.37

366.00

375.55

9.55

8.4

0.35

0.35

415.00

435.00

20.00

18.1

0.46

0.46

470.00

476.10

6.10

5.7

1.03

1.03

498.25

514.95

16.70

15.8

0.40

0.40

538.00

542.00

4.00

3.8

0.83

0.83

including

540.00

542.00

2.00

1.9

1.23

1.23

Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste interval of 10 metres. Shaded intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are approximate and assume a subvertical body. The fact that cut and uncut assays are the same, shows that all samples assayed less than the 30 g/t Au top cut.