Goldshore Awards Contracts for Resource Expansion & Discovery Focused Winter Exploration Programs

In This Article:

  • Diamond drilling program focused on expanding the mineral resource estimate within the conceptual open pit. Program will focus on the top 200 meters from surface by increasing drill density with the goal of extending known mineralization toward the surface to reduce the overall strip ratio and add to the ounce profile of the Moss Gold Project.

  • Discovery focused geophysical and geochemical program aims to define drill targets along 23 kms of prospective structural corridors that have not been systematically explored.

Vancouver, British Columbia--(Newsfile Corp. - November 25, 2024) - Goldshore Resources Inc. (TSXV: GSHR) (OTCQB: GSHRF) (FSE: 8X00) ("Goldshore" or the "Company") is pleased to announce it has awarded its resource expansion diamond drill program and its top of bedrock sonic drilling program to Laframboise Drilling Inc. and Forages Technic-Eau Inc., respectively. In parallel, the Company announces it has awarded the geophysical program to Abitibi Geophysics.

Michael Henrichsen, CEO of Goldshore commented, "We are very pleased to have awarded the contracts for our winter resource expansion and discovery-based exploration programs. The resource expansion targets we have identified have the potential to deliver ounces within the top 200 meters from surface, within the conceptual open pit, and could improve the economic performance of the deposit, building on the forthcoming Preliminary Economic Assessment ("PEA") scheduled for release in Q1 2025. In addition, the first systematic discovery-based geophysical and top of bedrock sonic drill programs will give the Company the opportunity to develop robust drill targets that we feel will ultimately lead to a discovery and the uncovering of additional ounces at the project."

Resource Expansion Drilling

The in-pit diamond drill program consists of approximately 15,000 meters of drilling focused on the top 200 meters from surface (Figure 1) with the goal of expanding the current mineral resource estimate ("MRE") and reducing the strip ratio of the deposit through the following three avenues.

  • Strategic infill to increase drill density in locations where mineralized drill intercepts are currently too widely spaced to be included in the inferred mineral resource category;

  • Extending known mineralized shear zones laterally along strike; and

  • Extending mineralized shear zones intersected at depth at the Moss Gold Project towards surface where no shallow drilling has occurred.

Figure 1: Illustrates the upcoming 15,000 meter drill program within the conceptual open pit associated with the current MRE. This drill program is targeting resource expansion within the top 200 m from surface.