Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Golden Arrow Reports a Strong Finish to Phase 2 Drilling, Including 224m @ 0.2% Copper, at San Pietro Project, Chile

In This Article:

TSX Venture Exchange (TSX-V): GRG
Frankfurt Stock Exchange (FSE): G6A
OTCQB Venture Market (OTCQB): GARWF

VANCOUVER, BC, Jan. 29, 2025 /PRNewswire/ - Golden Arrow Resources Corporation (TSXV: GRG) (FSE: G6A) (OTCQB: GARWF), ("Golden Arrow" or the "Company") is pleased to report results from the final two holes of the Phase 2 drill program at the San Pietro Copper-Gold-Iron-Cobalt Project in Chile ("San Pietro" or the "Project"). These two holes (SP-DDH-39 and SP-DDH-40) together with two of the previously reported holes from the program (SP-DDH-29 and SP-DDH-38) confirm a broad extension of the Rincones target up to 400 metres to the south (see Figure 1). Each of the four holes has now reported intervals of between 180 and 310 metres that average over 0.2% Cu and 0.03 g/t Au as well as significant cobalt and iron. This southern Rincones area is expected to have significant positive impact on the Mineral Resource Estimate ("MRE") that is currently underway. Furthermore, the area remains sparsely drilled and open for expansion, particularly towards the Colla target located approximately 600 metres further to the south-southeast.

Golden Arrow Resources Corporation logo (CNW Group/Golden Arrow Resources Corporation)
Golden Arrow Resources Corporation logo (CNW Group/Golden Arrow Resources Corporation)

Results of the final two holes are highlighted by:

  • 180m averaging 0.21% Cu, 0.07 g/t Au, 95 g/t Co and 12.9% Fe starting at 276.73m depth in hole SP-DDH-39, in an undrilled area 280m south of SP-DDH-38 and 220m along trend from SP-DDH-29

  • Pervasive mineralization from 75 m depth to nearly the end of the hole at 541 metres in SP-DDH-40, including 224 m averaging 0.20% Cu, 0.03 g/t Au, 63 g/t Co and 11.6% Fe starting at 317.05 metres

    • Geologic modelling indicates continuity of mineralization of this hole with SP-DDH-38 and earlier holes along section (see Figure 2).

Brian McEwen, VP Exploration and Development for Golden Arrow, commented, "Phase 2 drilling has definitely finished on a high note. We are going into our first resource estimate knowing that the infill program we designed has successfully confirmed what we had expected after our preliminary work: stronger mineralization and better continuity than many previous interpretations. We believe this will translate into an MRE that shows our investors and stakeholders that we have again discovered a substantial deposit with strong upside and value-creation potential. Phase 2 might be done but we can't wait to get back out into the field to keep drilling and building Rincones, potentially all the way to Colla, as well as continuing to make new discoveries at our many targets throughout the massive project area, including some exciting prospects that were newly identified in 2024."