Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Giant Mining Corp. Mobilization for March 2025 Drill Program at Majuba Hill Copper-Silver-Gold Project, Nevada

In This Article:

VANCOUVER, BRITISH COLUMBIA - March 14, 2025 (NEWMEDIAWIRE) - Giant Mining Corp. (CSE: BFG | OTC: BFGFF | FWB: YW5) ("Giant Mining" or the "Company") is pleased to announce that commencing next week final site preparations, equipment, and water delivery will be underway in order to commence drilling at the Majuba Hill Porphyry Copper Deposit ("Majuba Hill"), a copper, silver, and gold project located in Pershing County, Nevada.

Final road drill pad preparations will be completed by Legarza Exploration, LLC ("Legarza") with Big Sky Exploration, LLC ("Big Sky") expected to start drilling on or about March 24, 2025 for the previously announced diamond core drilling (the "Core Program").

"Gold is nearing an all-time high of USD $3,000 per ounce and Copper has just hit a 2025 high of USD $4.93 per lb under threat of Tariffs and looming copper shortfalls. With drilling now less than two weeks out we are excited to see final site preparations about to get underway. We look forward to a pivotal moment for Majuba Hill in 2025 following our best results to date in 2024." said David Greenway, CEO of Giant Mining. "The company is fully funded for an active year of exploration and development drilling to add to over 100 drill holes and over 80,000 feet of past drilling in order to work towards a NI 43-101 mineral resource estimate for the project."

Figure 1: Majuba Hill showing 2025 Proposed Drill Hole Locations

As previously announced the Company plans to drill 4 holes totaling 4,400 feet (1,340 meters) of core drilling within the existing exploration target area. A minimum of 2,600 feet will be completed and the contract does not have a maximum drilling requirement, allowing for flexibility in the execution of the project. If the holes are in mineralization beyond the contemplated 1,100 feet (335 meters) per hole the company has allowed for drilling to continue up to 1,600 feet (487 meters).

Blue Sky will be using the LF90D surface diamond coring drill which features a telescopic dump mast making it ideal for truck or crawler mounting to suit site conditions. The modular layout of components on the drill makes it easy to replace worn components in the field, minimizing downtime, and enabling more flexible usage. The LF90D has a total depth capacity of up to 3,915 feet. (1,193 meters) (NRQ W-Wall).

Click here to see Figure 2: Drilling Equipment on Site during previous drill campaigns

The Core Program is designed to follow up geology and mineralization intersected in core holes MHB-30 ("MHB-30") and MHB-31 ("MHB-31").