Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Giant Mining Corp. Announces Completion of Initial Drill Targeting for Upcoming Phase One Drill Program at Majuba Hill

In This Article:

VANCOUVER, BRITISH COLUMBIA - March 3, 2025 (NEWMEDIAWIRE) - Giant Mining Corp. (CSE: BFG | OTC: BFGFF | FWB: YW5) ("Giant Mining" or the "Company") is pleased to announce it has completed initial drill targeting in conjunction with Exploration Technologies Inc. ("ExploreTech") for the upcoming Phase One Drill Program. In partnership with the Giant Mining technical team, ExploreTech used its Engine AI and cloud computing platform to generate optimized drill plans and targets which focus on breccia pipes and large low-resistivity anomalies. See About section for additional details on the ExploreTech methodology.

"After numerous, detailed discussions with the Majuba team, we initiated a compute process that took approximately one full week of 24/7 cloud computation. Serious computing power went into processing the wealth of data at Majuba, and we are very satisfied with the results. We look forward to continuing our collaboration over the next months, with such a talented team at Giant Mining, and on the highly promising Majuba Mountain area," said Tyler Hall, President of Exploration Technologies.

"We are thrilled with the results of ExploreTech's initial modeling. Preparations are beginning now for the 2025 exploration and development drilling season at Majuba Hill. With over 100 Drill holes to date and over 80,000 feet of drilling at the Majuba Hill Copper-Silver-Gold deposit we truly believe 2025 will be the year we take the project to the next level," said David Greenway, President and CEO of Giant Mining Corp.

ExploreTech will be attending Giant Mining Corp's Booth #3007 at PDAC on Monday, March 3rd, 2025, from 11:30 AM to 1:00 PM EST.

The results provide insight into the large copper target generated by the last 4 years of exploration by the Company. The 2025 Phase 1 drill program will consist of 4 drill holes for a total of 4,400 feet of drilling of 1,100 feet (335 meters) per hole. The Company has allowed for drilling to continue up to 1,600 feet (487 meters) per hole at the technical team's discretion. The drilling will follow up hole MHB-30 ("MHB-30") drilled in 2024 which encountered high-grade copper-silver mineralization. ExploreTech took into consideration the proposed 2025 drilling campaigns along with previous exploration data. This data consists of over 80 previous drill holes and over 83,000 feet of drilling, along with the results of previous extensive surface sampling, geological mapping, geophysics, underground sampling, rigorous studies, and analysis.