Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Giant Mining Corp. Advances Payment to Big Sky Exploration LLC for Upcoming Phase One 4 Core Hole Drill Program at Majuba Hill

In This Article:

VANCOUVER, BRITISH COLUMBIA - February 18, 2025 (NEWMEDIAWIRE) - Giant Mining Corp. (CSE: BFG | OTC: BFGFF | FWB: YW5) ("Giant Mining" or the "Company") is pleased to announce it has advanced the deposit to Big Sky Exploration, LLC ("Big Sky") for the upcoming diamond core drilling (the "Core Program") at the Majuba Hill Porphyry Copper Deposit ("Majuba Hill"), a copper, silver, and gold project located in Pershing County, Nevada.

Figure 1: Drilling Equipment on Site during previous drill campaigns

"We are looking forward to an exciting 2025 and are thrilled to be working with the team at Big Sky again on this next phase of drilling at Majuba Hill, Nevada," said David Greenway, chief executive officer of Giant Mining. "The company is fully funded for an active year of exploration and development drilling at Majuba Hill and the entire Giant Mining team has high hopes of making 2025 Giant Mining's most exciting year yet."

The Company plans to drill 4 holes totaling 4,400 feet (1,340 meters) of core drilling within the existing exploration target area. A minimum of 2,600 feet will be completed and the contract does not have a maximum drilling requirement, allowing for flexibility in the execution of the project. If the holes are in mineralization beyond the contemplated 1,100 feet (335 meters) per hole the company has allowed for drilling to continue up to 1,600 feet (487 meters).

The Core Program is designed to follow up geology and mineralization intersected in core holes MHB-30 ("MHB-30") and MHB-31 ("MHB-31").

Click Here to see Figure 2: Magmatic-Hydrothermal Breccia Corridors and Prominent Breccia Bodies

This maiden 2025 drill program is a key component of Giant Mining Corp.'s ongoing initiative to advance exploration efforts at Majuba Hill. The planned drill program will target the Southern Breccia Corridor with holes oriented to intersect the high-grade mineralized breccia. Drilling will focus on the deeper portions of the breccia and the extensions of the high-grade copper zones below the historic underground workings.

Some of Majuba Hill's critically important characteristics are as follows:

Location: Nevada The #1 mining jurisdiction on the planet according to the Fraser Institute

Project Size: 9,684 Acres

Infrastructure: The Majuba Hill property is 113 road km (70 miles) southwest of Winnemucca, Nevada, and 251 km (156 miles) northeast of Reno. Access is by well-maintained county roads from the Imlay, Nevada exit on U.S. Interstate 80, and traveling westward 23 miles. People, Roads, Power and Water are the basic elements when considering infrastructure and Majuba Hill already has a solid infrastructure foundation for building a large facility which will provide significant savings compared to more remote projects.


Waiting for permission
Allow microphone access to enable voice search

Try again.