Unlock stock picks and a broker-level newsfeed that powers Wall Street.

G Mining Ventures Announces Consolidated Mineral Reserves and Resources for Year-End 2024 including Mineral Resource Estimate for the Gurupi Project in Brazil

In This Article:

All amounts are in USD unless stated otherwise

  • Significant Resource Growth – +295% growth in year-over-year consolidated mineral resources to a total of 8.28 Moz of indicated resources and 2.40 Moz of inferred resources

  • Tocantinzinho Gold Mine – Good replacement of mineral reserves after first year of production with current mineral reserves of 2.03 Moz

  • Oko West Project – Positive infill drilling results from 49,000m of drilling to support upcoming Feasibility Study and initial mineral reserve estimate

  • Gurupi Project – Updated mineral resource estimate ("MRE") of 1.83 Moz of indicated resources and 0.77 Moz of inferred resources

  • Fourth quarter and year-end 2024 earnings conference call scheduled for March 28, 2025

BROSSARD, QC, Feb. 20, 2025 /CNW/ - G Mining Ventures Corp. ("GMIN" or the "Corporation") (TSX: GMIN) (OTCQX: GMINF) is pleased to provide an update on year-end 2024 mineral reserves and mineral resources ("MRMR") and announce the updated mineral resource estimate ("MRE") for its 100% owned, advanced exploration-stage Gurupi Project ("Gurupi"), located in northern Brazil, prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").

Year-End 2024 Mineral Reserves and Mineral Resources Update

2024 Year-End ("YE") Consolidated MRMR Highlights:

  • Measured & Indicated ("M&I") Resources: 8.28 million ounces ("Moz") (164 Mt @ 1.57 g/t Au)

  • Inferred Resources: 2.40 Moz (39 Mt @ 1.92 g/t Au)

  • Proven & Probable Reserves: 2.03 Moz (51 Mt @ 1.24 g/t Au)

Table 1: GMIN Consolidated MRMR Estimate YE 2024 (Resources inclusive of Mineral Reserves)1


M&I Resources

Inferred Resources


Tonnes

Grade

Ounces

Tonnes

Grade

Ounces

kt

g/t Au

koz Au

kt

g/t Au

koz Au

Tocantinzinho

55,767

1.22

2,181

752

1.12

27

Oko West

64,606

2.05

4,266

19,617

2.54

1,603

Gurupi

43,512

1.31

1,830

18,517

1.29

770

Total

163,886

1.57

8,277

38,886

1.92

2,401

 


Proven Reserves

Probable Reserves

P&P Reserves


Tonnes

Grade

Ounces

Tonnes

Grade

Ounces

Tonnes

Grade

Ounces


kt

g/t Au

koz Au

kt

g/t Au

koz Au

kt

g/t Au

koz Au

Tocantinzinho

26,798

1.23

1,061

24,259

1.24

971

51,057

1.24

2,031

Oko West

-

-

-

-

-

-

-

-

-

Gurupi

-

-

-

-

-

-

-

-

-

Total

26,798

1.23

1,061

24,259

1.24

971

51,057

1.24

2,031

1.     A full list of underlying assumptions can be found in the Appendix A section below.

Gurupi Project Mineral Resource Estimate

The Gurupi Project (formerly known as the CentroGold Project) comprises 47 contiguous tenements covering ~2,100 km2 situated along +80 km of known mineralized trend. The Project is located approximately 380 km southeast of Belém, capital of the State of Pará, and 500 km west northwest of São Luis, capital of the State of Maranhão.