FPX Nickel and JOGMEC Initiate Exploration at the Expanded Klow Property in British Columbia

In This Article:

VANCOUVER, BC, May 27, 2025 /CNW/ - FPX Nickel Corp. (TSX-V: FPX) (OTCQB: FPOCF) ("FPX" or the "Company") is pleased to announce planned exploration activities at the Company's Klow property ("Klow" or the "Property"), located 45 km north of the Company's Baptiste Nickel Project. Exploration will be 100% funded by the Japan Organization for Metals and Energy Security ("JOGMEC") under the terms of an earn-in agreement which provides JOGMEC the option to earn up to a 60% interest in the Property. The Company has recently expanded the mineral claims at Klow by 600%, bringing the Property to 164 km2 and is currently preparing a wide-ranging surface rock sampling program over the summer of 2025 with the goal of advancing Klow to drill-ready status.

Highlights

  • Previous rock sampling and drilling has identified multiple large-scale awaruite nickel targets within the overall district-scale Klow Property (164 km2 land package)

  • Historic drill results at the Klow North Target include a near-surface intercept of 316 m at a grade of 0.097% nickel-in-alloy (a chemical dissolution used to estimate nickel contained in awaruite mineralization, see Note 1 below)

  • Planned Property-wide rock sampling program aims to expand known mineralized zones and identify new awaruite mineralization with the goal of delineating drill targets

  • Exploration at Klow will be 100% funded by JOGMEC

"Located north of our flagship Baptiste Nickel Project, and underlain by the same Trembleur ultramafic rocks that host Baptiste, Klow is one of the most highly prospective areas for awaruite mineralization in Canada," commented Keith Patterson, FPX's Vice President, Exploration. "Past results include surface samples and drill hole intercepts comparable to those from Baptiste, and large areas of the Property remain untested to date. We look forward to deepening our collaboration with JOGMEC in pursuit of advancing Klow to the drill-ready stage."

Historic Work

The Klow Property is located 120 km northwest of Fort St. James and 45 km north of FPX's flagship Baptiste Nickel Project. An all-season public road runs along the eastern margin of Klow, with a rail alignment located approximately 12 km west of the property.

Previous work at Klow includes mapping and rock sampling from 2009 to 2012, and a limited diamond drill program at the Klow North Target in 2012. Wide-spaced rock sampling has delineated several additional targets which will be further investigated with planned sampling in 2025.