NEW FOUND INTERSECTS 455 G/T AU OVER 4.1M, 148 G/T AU OVER 7.0M AND 58.6 G/T AU OVER 11.6M AT KEATS WITH PHASE II TRENCH CHANNEL SAMPLES

In This Article:

VANCOUVER, BC, Dec. 2, 2024 /CNW/ - New Found Gold Corp. ("New Found" or the "Company") (TSXV: NFG) (NYSE-A: NFGC) is pleased to announce the results of the second phase of channel samples from the Keats Trench and an update on the Iceberg Trench at the Queensway Project ("Queensway"), located on the Trans-Canada Highway 15km west of Gander, Newfoundland.

Keats Trench Phase II Highlights:

Channel No.

From (m)

To (m)

Interval (m)

Au (g/t)

True Width (%)

Zone

KM-24-01-32

1.75

8.90

7.15

14.78

85-95

Keats Trench

Including

2.65

3.35

0.70

126.01

85-95

KM-24-01-35

0.00

3.90

3.90

10.37

80-90

Keats Trench

Including

0.00

1.30

1.30

14.23

80-90

Including

3.35

3.90

0.55

22.49

80-90

KM-24-01-37

0.00

2.00

2.00

39.57

90-100

Keats Trench

Including

0.00

0.50

0.50

157.75

90-100

KM-24-01-39

0.00

2.80

2.80

11.53

90-100

Keats Trench

Including

1.60

2.10

0.50

50.49

90-100

KM-24-01-43

5.90

10.55

4.65

10.25

75-85

Keats Trench

Including

7.60

9.00

1.40

32.10

75-85

KM-24-01-45

0.00

4.95

4.95

73.63

85-95

Keats Trench

Including

0.00

2.25

2.25

158.74

90-100

KM-24-01-47

0.80

3.10

2.30

26.85

90-100

Keats Trench

Including

1.55

2.05

0.50

115.51

90-100

KM-24-01-48

0.75

5.60

4.85

12.19

90-100

Keats Trench

Including

0.75

1.55

0.80

64.37

90-100

KM-24-01-49

0.90

13.60

12.70

6.00

90-100

Keats Trench

Including

1.30

1.85

0.55

111.22

90-100

KM-24-01-50

0.00

2.35

2.35

54.25

85-95

Keats Trench

Including

0.55

1.60

1.05

120.76

85-95

KM-24-01-53

0.00

6.95

6.95

147.98

90-100

Keats Trench

Including

0.00

3.60

3.60

267.38

90-100

And Including

1.70

2.85

1.15

720.35

90-100

Including

6.30

6.95

0.65

93.66

90-100

KM-24-01-54

0.00

2.80

2.80

192.00

90-100

Keats Trench

Including

0.65

2.80

2.15

249.13

90-100

KM-24-01-55

0.30

3.15

2.85

220.67

90-100

Keats Trench

Including

0.30

0.95

0.65

139.73

90-100

Including

1.70

3.15

1.45

368.83

90-100

And Including

1.70

2.30

0.60

587.00

90-100

KM-24-01-56

0.00

2.85

2.85

330.71

90-100

Keats Trench

Including

0.00

2.25

2.25

418.12

90-100

And Including

0.50

1.10

0.60

1300.00

90-100

KM-24-01-57

1.65

12.95

11.30

2.44

85-95

Keats Trench

KM-24-01-59

1.00

12.55

11.55

58.62

80-90

Keats Trench

Including

2.80

3.53

0.73

258.82

80-90

Including

6.63

7.48

0.85

400.00

35-45

Including

10.05

10.75

0.70

119.32

90-100

Including

11.40

11.90

0.50

53.15

75-85

KM-24-01-60

0.00

14.20

14.20

22.09

80-90

Keats Trench

Including

8.40

12.20

3.80

70.86

80-90

KM-24-01-61

1.20

18.35

17.15

9.81

75-85

Keats Trench

Including

11.85

15.80

3.95

38.42

90-100

KM-24-01-62*

0.00

2.40

2.40

27.61

80-90

Keats Trench

KM-24-01-63

0.00

14.55

14.55

36.63

65-75

Keats Trench

Including

3.90

4.55

0.65

26.45

80-90

Including

6.40

8.20

1.80

266.21

50-60

And Including

7.30

8.20

0.90

509.00

50-60

KM-24-01-64*

0.60

4.65

4.05

455.33

55-65

Keats Trench

And Including

1.85

2.80

0.95

1494.00

55-65

KM-24-01-65

0.00

5.81

5.81

16.77

70-80

Keats Trench

Including

0.93

2.72

1.79

39.34

70-80

Including

4.72

5.43

0.71

10.09

70-80

KM-24-01-66

1.50

5.53

4.03

136.85

60-70

Keats Trench

Including

2.35

5.53

3.18

172.49

60-70

KM-24-01-68*

0.00

4.40

4.40

83.10

50-60

Keats Trench

Table 1: Keats Trench Channel Sample Highlights

Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed which could result in additional uncertainty in true width. Undulations in the bedrock surface could also result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum channel length of 2m with a maximum of 4m consecutive dilution. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as channel length. * Full composite composed of samples greater than 10 g/t Au, no Including interval inserted.

  • The Phase II channel sampling program at Keats was designed to increase sample density along high-grade veins to determine grade variability and assess vein domains oblique to the Phase I (September 23, 2024) systematic channel sampling grid.

  • The channel sampling results have demonstrated good continuity of high-grade gold mineralization across 77m of strike on the East-West Vein ("EW Vein") and 60m of strike on the Keats Main Vein (Figures 2 and 3).

  • These veins form principal components of the Keats Zone and are associated with the Keats-Baseline Fault Zone ("KBFZ"). They extend well beyond what is exposed in the Keats Trench both along strike and to depth and are also found in association with other high-grade vein arrays that host significant gold mineralization at Keats.

  • The Keats Main Vein has been drill defined over 520m of strike with an average down-dip extent of 200m and ranges in true width from 1-4m. The EW Vein has been structurally stacked and forms a series of at least five high-grade vein panels that range in strike length from 20-90m and are drill defined to depths of 120m, with true widths ranging from 1-5m.

  • EW Vein highlights from Phase II include 455 g/t Au over 4.05m in KM-24-01-64, 137 g/t Au over 4.03m in KM-24-01-66, 331 g/t Au over 2.85m in KM-24-01-56, and 221 g/t Au over 2.85m in KM-24-01-55. These infill intervals compare well with the along strike Phase I channel samples and nearby drilling. In areas with increased vein complexity, intervals can be upwards of 10m wide as demonstrated by the following Phase II highlights of 58.6 g/t Au over 11.55m in KM-24-01-59, 22.1 g/t Au over 14.20m in KM-24-01-60, and 36.6 g/t Au over 14.55m in KM-24-01-63 and results from Phase I.

  • Keats Main Vein highlights from Phase II include 73.6 g/t Au over 4.95m in KM-24-01-45, 54.3 g/t Au over 2.35m in KM-24-01-50, and 26.9 g/t Au over 2.30m in KM-24-01-47. These infill results are typical widths and grades of this segment of the exposed Keats Main Vein and demonstrate good continuity comparing well with the along strike Phase I channel samples and neighbouring drilling.

  • The Keats Trench exposed a 200m by 70m wide area, roughly corresponding to the surface expression of a portion of the Keats Main Zone, previously obscured by overburden.

  • The Phase II channel sampling program consisted of 41-lines with a total sampled length of 305m consisting of 455 individual samples. The Keats Trench Phase I channel sampling program was completed across the entire bedrock surface in the trench and consisted of a 27-line sampling grid spaced 7.5m apart, covering a total length of 1,782m that includes 2200 individual samples.