Fortitude Gold Drills 4.57 meters grading 2.26 g/t gold and 12.19 meters grading 1.06 g/t gold at County Line

In This Article:

COLORADO SPRINGS, CO / ACCESSWIRE / November 13, 2024 / Fortitude Gold Corp. (OTCQB:FTCO) (the "Company") announced multiple oxide gold drill intercepts at and near surface from the East Pit located on the County Line Property. Intercepts include 12.19 meters grading 1.06 grams per tonne (g/t) gold, 4.57 meters grading 2.26 g/t gold, and 0.67 meters grading 11.90 g/t gold. Fortitude Gold is a gold producer, developer, and explorer with operations in Nevada, U.S.A. offering investors exposure to both gold production and dividend yield.

East Pit drill highlights include (m=meters, g/t=grams per tonne) (full drill table below):

Hole# CLSN-24-004:

  • 11.73 m of 0.81 g/t gold from surface

incl.

  • 4.54 m of 1.23 g/t gold

Hole# CLSN-24-005:

  • 17.53 m of 0.83 g/t gold from 0.76 meters

incl.

  • 1.45 m of 2.48 g/t gold &

  • 2.06 m of 1.50 g/t gold

Hole# CLRC-408:

  • 16.76 m of 0.90 g/t gold from surface

incl.

  • 1.52 m of 2.19 g/t gold &

  • 3.05 m of 1.18 g/t gold

Hole# CLRC-409:

  • 18.29 m of 0.67 g/t gold from surface

incl.

  • 1.52 m of 1.16 g/t gold

  • 4.57 m of 2.26 g/t gold

incl.

  • 1.52 m of 4.69 g/t gold

Hole# CLRC-412:

  • 12.19 m of 1.06 g/t gold

These latest County Line East Pit drill results build on previous results including 3.05 meters of 2.11 g/t gold within 38.10 meters of 0.75 g/t gold. This most recent program intercepted multiple intervals of oxide gold mineralization at and near surface. The East Pit is located approximately 500 meters southeast of the main County Line historic open pit. The Company targets 2025 County Line gold production from both pits, subject to federal Bureau of Land Management permit approval timing.

The County Line project is located approximately 26 kilometers northwest of the Company's operating flagship Isabella Pearl gold mine via paved Nevada State Route 361. The Company targets County Line ore feed for its Isabella Pearl operation. The proximity of the two properties is expected to allow the trucking of ore from the County Line property to the Company's Isabella Pearl Project with its existing heap leach pad and gold processing facilities. The Company targets the County Line project as its second Nevada gold mine as it moves the project through the permitting phase

"This latest County Line East Pit drill program consistently intercepted oxide gold mineralization at and near surface," stated Mr. Allan Turner, Vice President of Exploration for Fortitude Gold. "Gold mineralization at the East Pit remains open to more exploration in multiple directions. We look forward to future drill programs to not only build on these results, but also to test undrilled nearby targets with a goal of adding additional gold resources at the County Line property."