Unlock stock picks and a broker-level newsfeed that powers Wall Street.

FOKUS MINING INTERSECTS 0.90 G/T AUEQ OVER 33 METRES INCLUDING 1.67 G/T AUEQ OVER 10.1 METRES AND PROVIDES UPDATE ON PHASE I EXPLORATION PROGRAM

In This Article:

TSX.V: FKM          OTCQB: FKMCF         Frankfurt: F7E1

ROUYN-NORANDA, QC, April 10, 2025 /CNW/ - Fokus Mining Corporation ("Fokus" or the "Company") (TSXV: FKM) (OTCQB: FKMCF) (FSE: F7E1) is pleased to announce an update of its 2024–2025 exploration program on the Galloway Property ("Galloway Project"), located in Abitibi, Quebec, along the Cadillac-Larder Lake Fault, between the Rouyn-Noranda and Kerr-Addison mining camps. The Galloway Project outlined a NI 43-101 inferred mineral resource of 1.42 million ounces of gold (41.2 Mt at 1.07 g/t Au) at US$1,750/oz, or 1.79 million ounces (57.5 Mt at 0.97 g/t Au) at US$1,960/oz, as detailed in our March 23, 2023, press release. This press release highlights the Company's recent drilling results and provides update on Phase 1 exploration program.

Recent Drilling Highlights

The Company is announcing results from the extension of drill hole GA-24-91, which targeted the RB (Renault-Bay) deposit, as well as from drill holes GA-25-93, GA-25-94, and GA-25-95, which intersected the Hurd target at the Galloway Project. Highlights include the following:

Philippe MacKay, President and CEO of Fokus Mining commented: " Results from Phase 1 of our exploration program consistently demonstrate robust geological continuity and mineralization, reinforcing the Galloway Project's potential. Recent results from the Hurd target, located 300 meters northeast of RB, highlight the presence of multiple broad mineralized zones that continue to expand across the property. The data suggest a significant gold system with meaningful copper intersections, indicating potential for an open-pit bulk-tonnage operation. Drilling completed earlier in Phase 1 confirmed the presence of a higher-grade core at depth within the Hendrick zone, supporting the potential for a bulk-tonnage underground operation. At GP and RB, drilling extended the near-surface mineralized footprint along strike, further reinforcing the potential for a larger-scale open-pit configuration. With the TITAN survey now finalized, the Company is preparing to initiate Phase II of drilling, which will focus on refining known zones and testing new targets across the Galloway property."

RB Target

     Hole GA-25-91 (Extension):

  • 0.64 g/t AuEq (0.60 g/t Au and 0.03% Cu) over 12.0m including: 

    • 1.87 g/t AuEq (1.81 g/t Au and 0.05% Cu) over 1.5m

    • 1.07 g/t AuEq (1.03 g/t Au and 0.04% Cu) over 1.5m

     Hole GA-25-91 (Extension):

  • 0.61 g/t AuEq (0.47 g/t Au and 0.11% Cu) over 18.0m including: 

    • 1.52 g/t AuEq (1.46 g/t Au and 0.05% Cu) over 1.5m