Unlock stock picks and a broker-level newsfeed that powers Wall Street. Upgrade Now
FOKUS MINING EXPANDS MINERALIZED FOOTPRINT CONNECTING GP AND HENDRICK DEPOSITS AT THE GALLOWAY PROJECT INTERSECTING 6.0M OF 4.61 G/T GOLD WITHIN A 45 METER INTERVAL OF 1.16 G/T GOLD

In This Article:

TSX.V: FKM  OTCQB: FKMCF  Frankfurt: F7E1

ROUYN-NORANDA, QC, Jan. 30, 2025 /CNW/ - Fokus Mining Corporation ("Fokus" or the "Company") (TSXV: FKM) (OTCQB: FKMCF) (FSE: F7E1) is pleased to announce an update of its 2024–2025 exploration program on the Galloway Property ("Galloway Project"), located in Abitibi, Quebec, along the Cadillac-Larder Lake Fault, between the Rouyn-Noranda and Kerr-Addison mining camps. This update highlights the Company's recent drilling results, planned drilling campaign and upcoming geophysical survey. The Company has also strengthened its financial position to assist in advancing exploration efforts.

Recent Drilling Highlights

The Company is reporting results from hole GA-24-89 on the Galloway Project, which intercepts both the GP (Galloway-Pitchevin) and Hendrick deposits, with the following highlights.

Philippe MacKay, President and CEO of Fokus Mining commented: "Hole GA-2024-89 expands the mineralized footprint throughout the length of the hole (1,107m), highlighting a series of long and broad intercepts. The discovery of low-grade mineralization between GP and Hendrick in a previously undrilled area supports a connection between these deposits. The results also confirm the continuity of higher-grade mineralization at GP while revealing shallower, broader zones that could be suitable for open-pit, bulk-tonnage mining, as well as higher-grade underground opportunities. Deeper exploration at Hendrick has provided valuable geological insights that will help guide the TITAN geophysical program, particularly in understanding copper distribution at depth, and will play a role in refining our exploration strategy"

  • 1.09 g/t Au over 22m including:

    • 5.69 g/t Au over 3m

  • 1.16 g/t Au over 45m including:

    • 3.05 g/t Au over 1.5m

    • 1.23 g/t Au over 1.5m

    • 4.61 g/t Au over 6m

  • 0.92 g/t AuEq (0.66 g/t Au and 0.20% Cu) over 81.2m including:

    • 1.53 g/t AuEq (1.31 g/t Au and 0.17% Cu) over 7.5m

    • 1.56 g/t AuEq (1.23 g/t Au and 0.25% Cu) over 1.5m

    • 1.61 g/t AuEq (1.34 g/t Au and 0.21% Cu) over 3m

    • 1.61 g/t AuEq (1.2 g/t Au and 0.31% Cu) over 1.5m

  • 0.91 g/t AuEq (0.66 g/t Au and 0.20% Cu) over 72m including:

    • 1.81 g/t AuEq (1.17 g/t Au and 0.49% Cu) over 1m

    • 2.12 g/t AuEq (1.47 g/t Au and 0.50% Cu) over 1.5m

    • 2.21 g/t AuEq (1.80 g/t Au and 0.31% Cu) over 2.4m

    • 6.78g/t AuEq (6.72 g/t Au and 0.05% Cu) over 1.5m

    • 1.92g/t AuEq (1.46 g/t Au and 0.36% Cu) over 3m

Drilling Results


Hole

From

To

Intercept

Grade Au

Cut-off

Target

(ID)

(m)

(m)

(m)

(g/t)

(g/t)

GP


GA-24-89

171

174

3

2.40

0.35


GA-24-89

229

240

11

1.09

0.35

including

GA-24-89

238

240

2

4.17

1.00


GA-24-89

270

309

39

0.69

0.35

including

GA-24-89

280.5

286.5

6

1.29

1.00

& including

GA-24-89

292.5

300

7.5

1.11

1.00


GA-24-89

319.5

341.5

22

1.09

0.35

including

GA-24-89

330

333

3

5.69

1.00


GA-24-89

345.9

390

44.1

0.47

0.35

including

GA-24-89

373.5

375

1.5

1.20

1.00


GA-24-89

517.5

562.5

45

1.16

0.35

including

GA-24-89

522

523.5

1.5

3.05

1.00

& including

GA-24-89

535.5

537

1.5

1.23

1.00

& including

GA-24-89

552

558

6

4.61

1.00


GA-24-89

571.5

589.5

18

0.78

0.35

including

GA-24-89

571.5

574.5

3

2.27

1.00

& including

GA-24-89

585

586.5

1.5

1.41

1.00


GA-24-89

598.5

609

10.5

1.04

0.35

including

GA-24-89

600

609

9

1.14

1.00