Focus Delivers Pre-Feasibility Update for Bayovar 12 Phosphate Project, Peru After-Tax NPV $458M--IRR 26.4%--Payback 3.9 Years--Mine Life 20 Years

VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 16, 2016) - Focus Ventures Ltd. (TSX VENTURE:FCV) ("FCV" or the "Company") is pleased to announce results for its National Instrument 43-101 Updated Pre-Feasibility Study ("Updated PFS") for its 70%-owned Bayovar 12 phosphate project in northern Peru. The Updated PFS was prepared by M3 Engineering & Technology Corp. ("M3") and Independent Mining Consultants Inc. ("IMC"), both based in Tucson, Arizona and is a change-in-scope study that replaces an earlier M3 Pre-Feasibility Study ("PFS") dated February 8, 2016. Key changes-in-scope include:

  • one large processing plant instead of the staged commissioning of two smaller ones

  • owner-operated instead of contractor-operated overburden stripping

  • doubling of pre-production overburden stripping

  • a simplified mine plan and production schedule

  • larger and more efficient loading and hauling equipment

  • a more logical and staged buildout of the tailings storage facility

These changes-in-scope increased capital cost, decreased operating cost and in turn significantly improved the financial performance of the project.

Simon Ridgway, Chairman and CEO of Focus, said, "In sedimentary phosphate deposits there are no starter pits. As a result, payback of capital is dependent upon achieving name plate process plant capacity and low operating costs early in the mine's life. With payback in 3.9 years and an after-tax NPV7.5 $458 million, the Updated PFS clearly demonstrates that large-scale open pit development at Bayovar 12 has the potential to deliver impressive cash margins over an initial 20 year mine life. It is Focus' goal to become the long-term supplier of choice for the direct application fertilizer market."

Except where otherwise noted, all currency amounts are stated in Q1-2016 United States dollars. All production volumes are stated on a 100% basis and all mined tonnages are stated on a dry basis. The Company will file the Updated PFS with Canadian securities regulators within 45 days of this release. It will be available at SEDAR and also on the Company's website.

The Company will host a Conference Call and Webcast on Tuesday, May 17, 2016 at 8am Pacific Time (11am Eastern, 4pm UK) to discuss the Updated PFS. Call-in details can be found at the end of this release.

Table I Life-of-Mine Highlights and Comparison with PFS

Item

Updated PFS

PFS

Variance %

Financial Model

After-Tax NPV7.5,$M

458.3

252.9

+ 81.2

IRR, %

26.4

17.2

+ 53.5

Payback, years

3.9

6.6

- 40.9

Capital Cost, $M

167.7

127.3

+ 31.7

Sustaining Capital, $M

193.6

230.3

- 15.9

Undiscounted Cash Flow, $M

1,150.9

846.9

+ 35.9

Product Price Deck, $/t

$145/$185

$145/$185

-

Open Pit Mine

Life, years

20

20

-

Waste, Mt

422.5

367.6

+ 14.6

Ore, Mt

58.8

52.3

+ 12.4

Waste/Ore

7.2

7.1

-

Pre-Production Waste, Mt

23.9

12.4

+ 92.7

Cash Cost Ore, $/t mined

14.69

19.51

- 24.7

Cash Cost Product, $/t

39.35

52.28

- 24.7

Process Plant

Tonnage Processed, M

58.8

52.3

+ 12.4

Tonnage Product, M

20.8

18.5

+ 12.4

Tonnage Product Years 1-5, M

4.75

3.50

+ 35.7

Cash Cost Product, $/t

7.99

10.49

- 23.8

Total Project

Cash Cost Product, $/t

59.79

75.44

- 20.7

Cash Margin Product, $/t

105.20

89.56

+ 17.5

PROJECT DESCRIPTION

The Bayovar 12 project is a conventional truck-loader open pit mine and a process plant that is designed to produce 24% and 28% P2O5 direct application phosphate rock fertilizer ("DAPR") "products". Phosphate ore will be mined at a rate of 8,000 tonnes per day from 13 overburden-covered and laterally-continuous sedimentary phosphate beds, interlayered with diatomite waste or "interburden". Overburden, interburden and phosphate ore are free-digging and do not require drilling or blasting. Ongoing back-filling of the open pit is an integral part of a mine plan that is designed for progressive closure. The average Waste/Ore ("W/O") ratio is 7.2/1.