First three months 2025 interim report: strong performance and strategic plan execution marked by the launch of Kelmė wind farm I. Full-year 2025 Adjusted EBITDA and Investments guidance reiterated

In This Article:

Ignitis grupe
Ignitis grupe

AB “Ignitis grupė” publishes its First three months 2025 interim report, which is attached to this notice.

Financial performance

Our Adjusted EBITDA for the first three months of 2025 amounted to EUR 188.5 million (+3.7% YoY). The growth was driven by the stronger performance of our two largest segments: Green Capacities and Networks. The Green Capacities segment remained the largest contributor with a 58.0% share of our total Adjusted EBITDA.

In 3M 2025, our Investments amounted to EUR 146.5 million (-30.1% YoY). In total, around half (48.7%) of the Investments were made in the Green Capacities segment, mainly for new solar and onshore wind farms. With several projects reaching COD or nearing completion, total Investments decreased compared to 3M 2024.

Our leverage metrics remained strong. The FFO LTM/Net Debt ratio remained robust with a 0.9 pp decrease to 28.8% (compared to 29.7% as of 31 December 2024).

Business development

Green Capacities: Portfolio increased to 8.4 GW (from 8.0 GW), Secured Capacity stands at 3.1 GW, Installed Capacity at 1.4 GW.

Key milestones: 
– finished construction works at Kelmė WF I (114.1 MW) in Lithuania; COD reached after the reporting period; 
– acquired a hybrid development project (285 MW) in Lithuania, which includes a 200 MW WF, a 65 MW SF and a 20 MW (80 MWh) BESS (Advanced Development Pipeline);
– acquired co-development wind farm projects (204 MW) in Estonia (Early Development Pipeline);
– received the first segments for the new 840 m penstock at Kruonis PSHP expansion project (fifth unit, 110 MW).

Networks: 3.5 EURb (+40%) Investments set in the 10-year (2024–2033) Investment Plan aligned with the regulator (NERC) on 23 January 2025; installed smart meters exceeded 1.1 million.

Reserve Capacities: won a Polish capacity mechanism auction for ensuring 381 MW and 484 MW capacity availability in Q1 and Q4 2026.

Customers & Solutions: 1,286 (+195 since 31 December 2024) EV charging points installed.

Sustainability

Our Green Share of Generation amounted to 60.7% (-19.3 pp YoY) due to proportionally higher electricity generation in CCGT (Reserve Capacities).

In 3M 2025, our total GHG emissions amounted to 1.43 million t CO2-eq (+22.8% YoY). Our Scope 2 emissions decreased by 4.5% YoY due to the use of renewable energy guarantees of origin for energy consumption at Kruonis PSHP. Scope 1 emissions increased by 103.6% YoY as a result of new services provided by Elektrėnai Complex, and Scope 3 emissions increased by 13.6% YoY due to higher electricity sales in Poland and an increase in overall gas sales.