F3 Hits 4.0m of 29.3% U3O8 Within 10.3% over 12.0m

In This Article:

Kelowna, British Columbia--(Newsfile Corp. - November 13, 2023) - F3 Uranium Corp (TSXV: FUU) (OTCQB: FUUFF) ("F3" or "the Company") is pleased to announce initial assay results for the ongoing drill program, including PLN23-079 (see NR August 14, 2023) which returned 12.0m of 10.3% U3O8, including a high grade 6.5m interval averaging 18.9% U3O8, further including an ultra-high grade core of 2.5m of 38.8% U3O8.

A 3D -DCIP survey by Dias Geophysical is currently underway, with an initial focus on the JR Zone and A1B areas. F3 anticipates those survey results to provide additional input into the geological and geophysical models of the A1 and A1B areas including the JR Zone, which will enhance drill targeting for the ongoing fall drill program and beyond.

Assay Highlight:

PLN23-079 (line 045S): mineralized intervals

  • 12.0m @ 10.3% U3O8 (231.5m to 243.5m), including:

  • 6.5m @ 18.9% U3O8 (233.0m to 239.5m), further including:

  • 4.5m @ 38.8% U3O8 (235.5 m to 238.0m)

Main ZR Zone Intercepts:

PLN23-063 (line 030S): mineralized intervals

  • 11.5m @ 0.63% U3O8 (233.0m to 244.5m), including

  • 2.0m @ 1.97% U3O8 (236.0m to 238.0m), and

  • 1.0m @ 1.75% U3O8 (243.5m to 244.5m), and

PLN23-064 (line 105S): mineralized intervals

  • 16.5m @ 0.53% U3O8 (233.5m to 250.0m), including

  • 5.5m @ 1.21 U3O8 (237.5m to 243.0m)

PLN23-073 (line 060S): mineralized intervals

  • 8.5m @ 2.14% U3O8 (221.5m to 230.0m), including

  • 1.0m @ 17.2% U3O8 (225.0m to 226.0m)

PLN23-074 (line 075S): mineralized intervals

  • 15.0m @ 0.37% U3O8 (225.0m to 240.0m), including

  • 0.5m @ 2.58% U3O8 (228.0m to 228.5m), and

  • 0.5m @ 1.64% U3O8 (233.0m to 233.5m)

PLN23-077 (line 090S): mineralized intervals

  • 10.0m @ 0.37% U3O8 (226.5m to 236.5m), including

  • 1.0m @ 2.24% U3O8 (234.0m to 235.0m)

Table 1. Drill Hole Summary and Uranium Assay Results

Collar Information

Assay Results

Hole ID

Grid Line

Easting

Northing

Elevation

Az

Dip

From
(m)

To
(m)

Interval
(m)

U3O8
weight %

PLN23-063

030S

587715.7

6410720.6

545.1

55.8

-61.1

233.00

236.00

3.00

0.20

 

 

 

 

 

 

 

236.00

238.00

2.00

1.97

 

 

 

 

 

 

 

238.00

243.50

5.50

0.18

 

 

 

 

 

 

 

243.50

244.50

1.00

1.75

PLN23-064

105S

587746.1

6410646.0

545.2

55.4

-58.2

233.50

237.50

4.00

0.22

 

 

 

 

 

 

 

237.50

243.00

5.50

1.21

 

 

 

 

 

 

 

243.00

250.00

7.00

0.17

PLN23-065

075S

587715.1

6410659.5

545.4

55.3

-61.4

242.50

245.50

3.00

0.07

PLN23-066

105S

587737.9

6410640.3

545.0

53.7

-60.0

225.50

226.00

0.50

0.15

 

 

 

 

 

 

 

240.50

241.00

0.50

0.07

 

 

 

 

 

 

 

243.50

248.50

5.00

0.09

 

 

 

 

 

 

 

248.50

249.50

1.00

1.37

PLN23-067

135S

587771.9

6410629.1

544.9

53.9

-60.8

222.00

238.50

16.50

0.17

PLN23-069

135S

587780.4

6410634.0

544.9

54.8

-60.4

229.00

229.50

0.50

0.10

PLN23-070

135S

587764.9

6410620.1

544.8

54.1

-62.1

240.00

242.00

2.00

0.05

PLN23-071

165S

587780.0

6410597.1

545.2

53.3

-60.2

A1 MSZ exploration; no mineralization >0.05

PLN23-072

690S

588216.9

6410265.7

530.3

54.3

-73.7

A1 MSZ exploration; no mineralization >0.05

PLN23-073

060S

587754.6

6410708.7

545.6

54.2

-60.3

221.50

225.00

3.50

0.13

 

 

 

 

 

 

 

225.00

226.00

1.00

17.2

 

 

 

 

 

 

incl

225.00

225.50

0.50

32.3

 

 

 

 

 

 

 

226.00

230.00

4.00

0.13

PLN23-074

075S

587745.9

6410683.9

545.7

56.3

-59.9

225.00

228.00

3.00

0.27

 

 

 

 

 

 

 

228.00

228.50

0.50

2.58

 

 

 

 

 

 

 

228.50

233.00

4.50

0.31

 

 

 

 

 

 

 

233.00

233.50

0.50

1.64

 

 

 

 

 

 

 

233.50

240.00

6.50

0.19

PLN23-075

1680S

588735.8

6409419.2

543.8

55.6

-54.9

A1 MSZ exploration; no mineralization >0.05

PLN23-076

195S

587828.1

6410595.1

545.5

53.5

-57.3

A1 MSZ exploration; no mineralization >0.05

PLN23-077

090S

587760.0

6410675.1

544.7

53.7

-59.2

226.50

234.00

7.50

0.17

 

 

 

 

 

 

 

234.00

235.00

1.00

2.24

 

 

 

 

 

 

 

235.00

236.50

1.50

0.09

PLN23-078

2640S

589375.5

6408704.6

543.0

62.4

-54.9

A1B BMZ exploration; no mineralization >0.05

PLN23-079

045S

587731.1

6410710.1

545.3

54.9

-61.1

231.50

233.00

1.50

0.10

 

 

 

 

 

 

 

233.00

235.50

2.50

2.34

 

 

 

 

 

 

 

235.50

239.50

4.00

29.3

 

 

 

 

 

 

incl

235.50

238.00

2.50

38.8

 

 

 

 

 

 

 

239.50

243.50

4.00

0.03

PLN23-080

045N

587667.2

6410774.0

545.2

54.6

-60.3

no mineralization > 0.05

PLN23-081

060S

587765.5

6410716.9

545.8

54.1

-60.9

215.00

216.00

1.00

0.51

PLN23-082

435S

587984.7

6410423.2

531.4

54.0

-49.6

A1 MSZ exploration; no mineralization >0.05

PLN23-083

030S

587731.4

6410728.2

545.3

53.9

-59.4

232.50

235.00

2.50

0.34