Equitas Resources Corp. : Equitas Resources Announces Three Jays 2013 Field Program Results for Nahmint Copper-Gold Property near Port Alberni, BC

December 3rd, 2013 - Equitas Resources Corp. (EQT.V) ("Equitas") is pleased to announce the receipt and preliminary evaluation of geochemistry results and geological mapping from the Three Jays Area 2013 Field Program completed in October of 2013.

Jay Roberge, President & CEO of Equitas Resources Corp. states, "We are very pleased with the conclusions of this preliminary evaluation on the Three Jays Area which has added four new, non-outcropping targets to three previously known and exposed targets in the immediate area. The Three Jays Area is a priority area for exploration drilling for the Nahmint Project in 2014. This preliminary evaluation will now be integrated into a updated NI 43-101 report for the Nahmint Project to be filed upon completion."

GPS-controlled `B` horizon soil sampling was completed at 50 m intervals and 100 m.line spacing, concurrently with geological mapping, rock and stream moss mat sampling over the 2 km x 1 km area of Three Jays North Grid.
Final geochemistry results were received on November 14-15, 2013 for the 6 stream moss mat, 303 soil and 35 rock samples taken during the October 2013 field program at the Three Jays North Grid on the Nahmint Property. All samples were received, prepared and analyzed by AGAT Laboratories, using their industry standard sample preparation methods for stream sediments, soils or rocks at AGAT`s Burnaby laboratory; and the 48 metal package by 4 acid digestion and ICP/ICPMS finish, and the trace gold by Fire Assay/ICP finish at their Mississauga laboratory. Geochemistry results from the 2013 program for target and indicator elements are statistically summarized as follows:

Media (#)

Moss (6)

Soil (303)

Rock (35)

Element

Mean

Maximum

Minimum

Mean

Maximum

Minimum

Mean

Maximum

Minimum

Au ppb

21

42

7

14.2

497

6.7 58

Cu ppm

78.2

98.3

46.6

47.8

397

3.7

198

840

2.1

Mo ppm

1.54

2.12

0.94

2.3

145

0.42

0.57

1.06

0.26

Co ppm

38.2

64

11.5

10.8

106

0.89

35.9

55.4

0.64

Ni ppm

53.2

90.5

28.4

19.9

498

1.1

81.6

151

0.8

Pb ppm

11.9

16.1

8.0

8.4

27.8

2.5

2.4

7

0.7

Cd ppm

4.6

13.8

0.35

0.19

8.37

0.02

0.12

0.71

0.04

Zn ppm

136

225

60.1

45.4

752

13.6

76.3

161

4.4

As ppm

36.1

127

4.9

21.6

754

0.5

2.4

7.5

0.6

Bi ppm

0.09

0.13

0.08

0.18

0.67

0.04

0.4

0.29

Te ppm

0.04

0.07

0.03

0.10

3.65

0.4 0.17

At the Three Jays North Grid, geological mapping has identified an elongate, 1.75 km x 250 m. flat-lying basin of Quatsino limestone along the centre of the grid, overlying Karmutsen mafic volcanics, intruded by steep, narrow felsic intrusive dykes, and cut by block faulting.