Equinox Gold Reports Second Quarter 2024 Financial and Operating Results

In This Article:

All financial figures are in US dollars, unless otherwise indicated.

Vancouver, British Columbia--(Newsfile Corp. - August 7, 2024) - Equinox Gold Corp. (TSX: EQX) (NYSE American: EQX) ("Equinox Gold" or the "Company") is pleased to announce its second quarter 2024 summary financial and operating results. The Company's unaudited condensed consolidated interim financial statements and related management's discussion and analysis ("MD&A") for the three and six months ended June 30, 2024 will be available for download on the Company's profile on SEDAR+ at www.sedarplus.ca, on EDGAR at www.sec.gov/edgar and on the Company's website at www.equinoxgold.com. The Company will host a conference call and webcast on August 8, 2024 commencing at 7:30 am Pacific Time to discuss second quarter results and activities underway at the Company. Further details are provided at the end of this news release.

Greg Smith, President and CEO of Equinox Gold, commented: "The highlight of the second quarter was achieving first gold pour at our new Greenstone Mine in Ontario. We also acquired our partner's 40% interest in the mine and now hold 100% of this world-class asset. We remain on schedule to achieve commercial production at Greenstone during the third quarter.

"At our Mesquite mine, slower-than-planned recoveries affected Q2 production and at our Aurizona mine, a geotechnical event caused a temporary suspension of production for May and June. Post quarter end, we have transitioned to residual leaching at our small Phase 1 Castle Mountain mine while we advance engineering and permitting for the 200,000-ounce-per-year Phase 2 expansion. Our adjusted guidance reflects lower production from these assets in 2024, offset by higher production and lower costs from our increased ownership in Greenstone. We continue to expect substantially higher gold production and significantly lower costs in the second half of 2024."

HIGHLIGHTS FOR THE THREE MONTHS ENDED JUNE 30, 2024

Operational

  • Produced 122,221 ounces of gold

  • Sold 115,423 ounces of gold at an average realized gold price of $2,328 per oz

  • Total cash costs of $1,747 per oz and AISC of $2,041 per oz(1)

  • One fatality during the Quarter, as discussed in the Fazenda section of the MD&A

  • No lost-time injuries; total recordable injury frequency rate(2) of 1.82 per million hours worked for the 12-month rolling period (1.80 for the Quarter)

  • Significant environmental incident frequency rate(2) of 0.29 per million hours worked for the 12-month rolling period (0.00 for the Quarter)

  • Temporarily suspended mining in the Piaba open pit at Aurizona following a geotechnical event as the result of persistent heavy rains; accelerated mining in the new Tatajuba open pit to mitigate the impact to production