Endeavour Silver Continues to Intersect Positive Drill Results at the Parral Project

In This Article:

Endeavour Silver Corporation
Endeavour Silver Corporation

VANCOUVER, British Columbia, Sept. 08, 2022 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (TSX: EDR, NYSE: EXK) is pleased to report positive drill results from its ongoing drill program at its Parral project in the State of Chihuahua, Mexico. The high-grade silver results show the potential for resource expansion at depth and along strike in the El Verde and Sierra Plata Deep areas along the Veta Colorada structure. Since April of this year, the Company has drilled over 5,300 meters in 23 holes, totaling 8,100 meters year to date, with the aim to define and extend mineralized zones.

Considerable exploration potential remains along the 35 square kilometre land package and exploration will be on-going, with additional testing for new discoveries with surface mapping and sampling underway. This program will aid the Company’s goal to define a mineral resource large enough to support a preliminary economic assessment.

Highlights from Recent Drill Results

  • 199 gpt Ag, 4.68% Pb and 2.64% Zn for 428 gpt AgEq over a 3.48 m ETW, including 501 gpt Ag, 8.08% Pb and 6.50% Zn for 971 gpt AgEq over 0.27 m (VCU-78)

  • 322 gpt Ag, 5.19% Pb and 1.62% Zn for 528 gpt AgEq over a 1.67 m ETW, including 605 gpt Ag, 14.8% Pb and 3.46% Zn for 1,150 gpt AgEq over 0.53 m (VCU-80)

  • 664 gpt Ag, 1.88% Pb and 0.80% Zn for 747 gpt AgEq over a 5.56 m ETW, including 5,600 gpt Ag, 15.35% Pb and 1.75% Zn for 6,096 gpt AgEq over 0.22 m (VCU-90)

  • 242 gpt Ag, 0.48% Pb and 1.66% Zn for 317 gpt AgEq over a 5.34 m ETW, including 711 gpt Ag, 0.53% Pb and 2.13% Zn for 806 gpt AgEq over 0.52 m (VCU-96)

Abbreviations include: gpt: grams per tonne; Ag: silver; Pb: lead; Zn: zinc; ETW: estimated true width; m: metre; HW: hanging wall. Silver equivalents are calculated using a silver price of $22 per troy ounce, lead price of $0.90 per pound and zinc price of $1.20 per pound.

“In the areas of the El Verde and Sierra Plata historically mined areas, we continue to verify extensions of the mineralized zones at depth and along strike,” stated Dan Dickson, Chief Executive Officer. “The focus for the rest of the year will be to test the northern part of the project with a surface drilling program on various north to south striking structures, such as the northern extension of Veta Colorada, San Alberto and the El Cabezón systems; as well as resuming drilling of the San Patricio vein.”

Latest Drill Results

The Parral drill results are summarized in the following tables:

Parral - Veta Colorada El Verde (view Veta Colorada (El Verde) longitudinal section)

Hole

Structure

From

To

True Width

Ag

Pb

Zn

AgEq

(m)

(m)

(m)

(gpt)

(%)

(%)

(gpt)

VCU-78

Veta Colorada

274.20

279.45

3.48

199

4.68

2.64

428

Including

276.65

277.05

0.27

501

8.08

6.50

971

VCU-79





Hw Veta Colorada

210.95

212.45

1.32

96

0.22

0.31

114

Including

210.95

212.00

0.93

95

0.26

0.37

116

Veta Colorada

216.40

218.40

1.77

297

0.64

2.28

400

Including

217.50

218.40

0.79

337

0.77

3.27

481

VCU-80

Veta Colorada

261.00

263.20

1.67

322

5.19

1.62

528

Including

262.20

262.90

0.53

605

14.80

3.46

1,150

VCU-81

Veta Colorada

309.80

312.05

1.32

83

0.81

0.35

119

Including

310.75

311.40

0.38

188

1.16

0.59

243


Parral - Veta Colorada Sierra Plata Deep (view Veta Colorada (Sierra Plata) longitudinal section)