Unlock stock picks and a broker-level newsfeed that powers Wall Street.

enCore Energy Continues Wellfield Expansion at the Alta Mesa Uranium Project; Announces Senior Vice President of Operations

In This Article:

NASDAQ:EU
TSXV:EU
www.encoreuranium.com

DALLAS, April 22, 2025 /CNW/ - enCore Energy Corp. (NASDAQ: EU) (TSXV: EU) (the "Company" or "enCore"), America's Clean Energy Company, today provided continued positive results from on-going improvements to wellfield operations at the Alta Mesa Uranium Central Processing Plant ("CPP") and Wellfield (see EU NR dated April 7, 2025). The Company also announced the promotion of Mr. Dain McCoig to the position of Senior Vice President of Operations.

enCore Energy Corp. logo (CNW Group/enCore Energy Corp.)
enCore Energy Corp. logo (CNW Group/enCore Energy Corp.)

The Alta Mesa CPP and Wellfield expansion highlights include:

  • Wellfield development continues to show positive results with a total of 32 wells, 15 extractors and 17 injectors installed and operational with uranium-bearing solution scheduled to be piped to the Alta Mesa CPP by April 23, 2025. This current rate of under two days per installed well is the best in the Company's history at the the Alta Mesa Project;

  • Installation of PathCAD wellfield simulation and design software providing enCore the ability to model wellfield flow for current and future wellfields. PathCAD software is proven to provide for improved wellfield management, efficient wellfield planning, operations and optimization of uranium extraction;

  • Wellfield 8 ("PAA-8"), planned for uranium extraction following the currently operational Wellfield 7 is now renamed Wellfield 3-Ext ("PAA-3 Extension"). The original plan to develop Wellfield 8 is altered due to new delineation drilling which indicates the uranium mineralization occurs within the same ore horizon and partially within the boundary of the existing monitor well ring of the past-producing Wellfield 3 ("PAA-3"). Modelling Wellfield 3-Ext as an extension of Wellfield 3 is expected to reduce permitting timelines and wellfield installation costs while extending the existing monitor well ring. This approach also provides the ability to capture uranium stranded within the previously operated Wellfield 3;

  • Alta Mesa wellfield optimization training and updated procedures are on-going. The enhanced procedures are positively impacting the productive life of existing wellfields and is expected to enhance future wellfield operations and total uranium capture.

William M. Sheriff, Executive Chairman, stated: "Since joining enCore in June 2023 as the Director of Technical Services, Dain has played a critical role in the successful restart of both the Rosita and Alta Mesa Central Processing Plants. On behalf of the Board of Directors, I want to congratulate him on a promotion that truly reflects his leadership, technical expertise and industry knowledge. In conjunction with Directors Dr. Dennis Stover and Mark Pelizza, Mr. McCoig and the site management have accelerated wellfield installation and made alterations to wellfield design to maximize uranium extraction while reducing expected wellfield development costs."