Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Element 29 Announces Results from Elida Phase-III Drill Program including 1039.6 metres of 0.54% CuEq2

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - January 22, 2025) - Element 29 Resources Inc. (TSXV: ECU) (OTCQB: EMTRF) (BVL: ECU) ("Element 29" or the "Company") announces results from the first two drill holes from its 2,249.8 metre ("m") Phase-III diamond drill program at its Elida Porphyry Copper ("Cu") - Molybdenum ("Mo") - Silver ("Ag") Deposit ("Elida" or the "Property") in central Perú (Figure 1).

The Company continues to intersect long intervals of Cu-Mo-Ag mineralization starting near surface and extending to vertical depths of over 1000 m highlighting the potential for further resource expansion. The objective is to complete the remaining Phase-III drill program starting in early Q2, 2025.

Elida Drilling Highlights

  • Drill hole ELID033 intersected 0.54% CuEq2 (0.39% Cu, 0.036% Mo, 2.96 g/t Ag) over 1039.6 m starting from bedrock surface to the end of the hole ("EOH") at 1109.6 m.

  • Drill hole ELID035 intersected 0.54% CuEq2 (0.33% Cu, 0.045% Mo, 2.76 g/t Ag) over 922.4 m starting at bedrock surface to the EOH at 979.0 m.

  • Drill hole ELID033 extended the porphyry Cu-Mo-Ag mineralization with higher Cu grades than the existing pit-constrained Inferred Mineral Resource Estimate to a vertical depth of more than 1000 m along the western side of the Zone-1.

  • The Cu-Mo-Ag grades in ELID033 also increased significantly at depth with the last 310.1 m grading 0.71% CuEq2 (0.56% Cu, 0.040% Mo, 3.49 g/t Ag). This suggests the Cu-Mo-Ag mineralization is increasing at depth on the western side of Zone-1.

Richard Osmond, President and CEO of Element 29 Resources, states, "The Elida porphyry system continues to impress with both drill holes returning significant intervals of copper mineralization at higher grades than the existing Inferred Mineral Resource Estimate starting at bedrock surface and extending vertically to a depth of more than 1000 m. We look forward to completing the Phase-III drill program and continuing to expand Elida into a potential Tier-1 copper deposit."

Watch this short video by Richard Osmond, CEO, on the drill highlights - HERE.

The Elida Phase-III diamond drill program was designed to expand the existing pit-constrained initial Inferred Mineral Resource Estimate1 of 321.7 million tonnes of 0.32% Cu, 0.03% Mo, and 2.61 g/t Ag at a 0.2% Cu cutoff and a 0.74:1 strip ratio ("Mineral Resource"). These drill holes were also planned to infill gaps within the existing pit-shell to potentially increase the higher-grade 59.7 million tonne resource of 0.49% Cu, 0.036% Mo, and 3.99 g/t Ag at a 0.40% Cu cut-off ("Higher-Grade Resource") and continue drilling to depths of up to 1000 m while in porphyry Cu-Mo-Ag mineralization.