Unlock stock picks and a broker-level newsfeed that powers Wall Street.
Electric Metals Launches Preliminary Economic Assessment on the Emily Manganese Project, Minnesota
ACCESS Newswire · Electric Metals (USA) Limited

In This Article:

TORONTO, ON / ACCESS Newswire / January 28, 2025 / Electric Metals (USA) Limited ("EML" or the "Company") (TSXV:EML)(OTCQB:EMUSF) is proud to announce the launch of its Preliminary Economic Assessment (PEA) for the Emily Manganese Project in Minnesota, a pivotal step in securing a domestic supply of high-purity manganese vital for the United States' national security and energy infrastructure.

The PEA is being conducted by Forte Dynamics, Inc., a United States-based mining and engineering consulting firm, in accordance with US and Canadian securities requirements [1]. The PEA will evaluate the technical and economic viability of the Emily Manganese Project. It will assess the project scope, production potential, mining methods, infrastructure requirements, environmental compliance matters, and project economics. These insights will guide regulatory processes, inform investment decisions, and shape the project's strategic direction.

Key Project Milestones

  • Advanced geological analysis and resource estimation updates to refine the understanding of the deposit's potential.

  • Technical assessments, including preliminary underground mining methods, stope layouts, and life-of-mine scheduling.

  • Development of optimized processing flowsheets and evaluation of sustainable infrastructure designs.

  • Planning of surface infrastructure, including access roads, waste management, and water resources, ensuring alignment with sustainability goals.

  • Key financial metrics, including Net Present Value (NPV), Internal Rate of Return (IRR), and economic payback period.

In recent months, the project team has completed a comprehensive review of existing data, achieved a thorough gap analysis, and accelerated efforts to finalize technical studies. These steps lay the foundation for delivering a robust, actionable PEA in Q2 2025, enabling the Company to progress toward subsequent phases of development.

Environmental and Economic Impact
The Emily Project is being developed with environmental stewardship at its core, integrating sustainability and permitting considerations at every stage. By advancing this project, Electric Metals is not only addressing a critical supply chain gap but also contributing to the United States' energy independence and national security.

CEO and Director Brian Savage commented: "The launch of the Emily Manganese Project PEA, the highest grade manganese deposit in North America, represents a decisive step toward reducing the United States' dependence on foreign sources for manganese production. Our goal for the Emily Project is to support the monumental shift toward US energy independence, strengthen national security, domestic industrial resilience, and support our mission to become a leading supplier of high-purity manganese for critical industries in the United States. We are excited about the progress and remain dedicated to advancing this project with operational excellence and environmental responsibility."