Eldorado Gold Delivers Gold Production of 520,293 Ounces in 2024, Above the Midpoint of Tightened Guidance, With Solid Fourth Quarter Preliminary Gold Production of 155,669 Ounces; Provides Skouries Construction Progress and Conference Call Details

In This Article:

Eldorado Gold Corporation
Eldorado Gold Corporation

(All dollar figures are in US dollars, unless otherwise stated)

VANCOUVER, British Columbia, Jan. 14, 2025 (GLOBE NEWSWIRE) -- Eldorado Gold Corporation (“Eldorado” or “the Company”) announces fourth quarter 2024 preliminary gold production of 155,669 ounces, and full year preliminary gold production of 520,293 ounces, delivering 7% annual production growth over 2023. Fourth quarter production was very strong at the Lamaque Complex and Kisladag, while Efemcukuru continued to deliver on expectations. Overall production was well in line with the Company’s guidance of a stronger second half in 2024. Full year preliminary production was above the midpoint of the tightened guidance range of 505,000 to 530,000 ounces, as announced in the third quarter 2024 results news release. Detailed production, by asset, is outlined in the table below.

2024 Preliminary Gold Production

Mine

Gold Production (oz)

Q4 2024

Q3 2024

Q2 2024

Q1 2024

Lamaque Complex

63,742

43,106

47,391

42,299

Kisladag

56,483

41,084

38,990

37,523

Efemcukuru

19,451

19,794

22,397

18,501

Olympias

15,992

21,211

13,541

18,788

Total Gold Production (oz)

155,669

125,195

122,319

117,111


Mine

Gold Production (oz)

Full Year 2024

Full Year 2023

Lamaque Complex

196,538

177,069

Kisladag

174,080

154,849

Efemcukuru

80,143

86,088

Olympias

69,532

67,133

Total Gold Production (oz)

520,293

485,139


Canada

Lamaque Complex
The Lamaque Complex delivered record gold production both in the fourth quarter and for the year. Since the beginning of 2019 a total of approximately 959,000 ounces have been produced to the end of 2024. We expect to reach another milestone with the pour of our one millionth ounce in the first quarter of 2025. During the fourth quarter, production increased 48% over the third quarter driven by higher ore grade and mill throughput. This included processing of the Ormaque bulk sample that also met expectations of modelled grade.

Turkiye

Kisladag
At Kisladag, fourth quarter gold production increased 37% over the third quarter driven by the benefit of having two Adsorption-Desorption-Recovery (ADR) facilities as well as increased draw down on the existing inventory. This was coupled with steady performance in stacking and leaching aided by irrigation optimization activities that have been implemented. While this positive trend is expected to continue, we also expect, as in prior years, that the first quarter of 2025 will be a lower production quarter as leach kinetics slow during the colder months, in addition, we will have a planned 6-day HPGR roll change. Improvement is expected through subsequent quarters.