Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Eagle Plains Resources and SKRR Exploration Provide Update on the Olson Gold Project
ACCESS Newswire · Eagle Plains Resources Ltd.

In This Article:

CRANBROOK, BC / ACCESS Newswire / April 28, 2025 / Eagle Plains Resources Ltd. (TSX-V:EPL) ("EPL" or "Eagle Plains") is pleased provide an update on its 25% owned Olson gold property (the "OlsonProject") in partnership with SKRR Exploration Inc. (SKRR)(B04Q) ("SKRR"), which owns 75% of the Olson Project.

The Olson Project area covers approximately 12,951 hectares and is located within the Trans Hudson Corridor, 20km northwest of Deschambault Lake, Saskatchewan and 80km south of SSR Mining Inc.'s Seabee Gold Operation. The Project has proven Au (gold) mineralization with many under-evaluated targets, with both high-grade mineralization potential in volcanic-metasedimentary host rocks, and lower grade bulk tonnage potential in intrusive host rocks.

Since optioning the property in 2019, SKRR has completed 6,522m (21,937 feet) of diamond drilling in 40 holes. Drill programs in 2020, 2021 and 2022 extended known mineralized trends at the Olson and Sisken zones as well as defining newly discovered gold mineralization at the Point, Jena, Ackbar and Michael's Lake zones. (see EPL news releases dated February 4, 2021, March 25, 2021, May 6, 2021, May 03, 2022).

Planning is currently underway for a 2025 work program.

See Olson Project Information and Map here

2020 - 2022 Drilling Highlights

Analytical results from drilling ranged from trace values to broad, high-grade intercepts, as summarized below. All drill indicated intercepts as reported in this news release are measured along core length and true thickness is yet to be determined.

Inaugural drilling at the Point Zone in 2020 returned 39.80m @ 1.09 g/t Au (3.05m to 42.85m), including 7.62m @ 3.44 g/t Au (15.75m to 23.37m) and 1.53m @ 13.80 g/t Au (21.84m to 23.37m) from DDH OL20004 and 31.04m @ 0.51 g/t Au (2.88m to 33.92m) from DDH OL20005. 2020 intercepts at the Jena Zone included DDH OL20002 which returned 1.53m @ 13.5 g/t Au (125.13m to 126.66m). Other 2020 highlights include OL20017 which returned 1.23m @ 9.64 g/t Au (140.65 to 141.88m) at the Olson Zone.

A successful follow-up drilling program was completed in 2021. Highlight intercepts at the Point Zone included OL21019 which returned 50.24m @ 0.41 g/t Au (3.23m - 53.47m), including 6.25m @ 1.15 g/t Au (35.75m - 42.00m). Olson Zone drilling results included OL21026 which returned 29.44m @ 1.30 g/t Au (105.04m - 134.48m), including 10.21m @ 2.95 g/t Au (120.11m - 130.32m) and 0.78m @ 14.55 g/t Au (126.45m - 127.23m). The first hole at the Ackbar Lake target was also completed in 2021, with DDH OL21029 intersecting 8.12m @ 0.75g/t Au (98.0 to 106.2m).