Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Core Assets Drills Longest Massive Sulphide Intercept to Date 11.78m of 10.6% Zinc, 0.36% Copper & 16g/t Silver from Surface

In This Article:

VANCOUVER, BC / ACCESSWIRE / November 19, 2024 / Core Assets Corp., ("Core Assets" or the "Company") (CSE:CC)(FSE:5RJ)(OTCQB:CCOOF) is pleased to present assay results from the 2024 diamond drilling campaign at the Silver Lime Project (the "Silver Lime Project" or "Silver Lime"), central Blue Property (the "Blue Property"), Atlin Mining District of NW British Columbia.

Click here for a video synopsis of 2024 diamond drilling highlights and work completed to date at the Silver Lime Project featuring Core Assets' Project Geologist Lauren Piccott.

On November 28th @ 10am PST Core Assets' Vice President of Exploration Monica Barrington is offering a live technical session where she will discuss the results of the 2024 diamond drilling program highlighted in this press release. Please send technical questions to info@coreassetscorp.com prior to the session. Link to live technical session is available here: https://us02web.zoom.us/j/82377544148

Eleven (11) diamond drill holes totalling 3,602.35m were completed across a 2.7km mineralized trend at the Silver Lime Project in 2024 (Tables 1-4). Drilling was successful in extending the footprint of Mo-Cu-Ag porphyry and Fe-Zn-Cu massive and semi-massive sulphide skarn mineralization in and around the Sulphide City Target (including the defined Whaleback Skarn, Grizzly and Gally targets).

HIGHLIGHTS

Three (3) drill holes were completed from one (1) pad at the Whaleback Fe-Zn-Cu Skarn Target in 2024 for a combined total of 304.15m (Figures 1 and 2; Table 1). All holes were oriented north-northwest and targeted the high-grade Fe-Zn-Cu massive sulphide skarn mineralization that was channel sampled at surface in 2021:

  • SLM24-060 returned 10.5m of 7.8% Zn, 0.25% Cu and 10g/t Ag within 39.9m of 2.5% Zn, 0.13% Cu and 5.1g/t Ag.

  • SLM24-061 returned 11.78m of 10.6% Zn, 0.36% Cu and 16g/t Ag from surface.

  • Skarn mineralization at Whaleback forms a 250m long trend with high-grade Zn-Cu-Ag-Pb carbonate replacement mineralization exposed at surface at the Gally Target, where shallow drilling in 2023 intersected 8m of 139g/t Ag, 3.5% Pb+Zn and 0.18% Cu from surface, including 1.3m of 845g/t Ag, 31.3% Pb+Zn and 1.10% Cu. (Figure 2a).

Drilling at Sulphide City in 2022 intersected the same mineralized marble horizon that hosts the mineralization at the Whaleback & Gally targets at a drilled depth of 241m in hole SLM22-013 (or 120m true depth). This intercept returned 0.53m of 9.0% Zn within 2.31m of 2.0% Zn and 644ppm Cu and indicates that high-grade Fe-Zn-(Cu) skarn mineralization extends from surface to a minimum true depth of 120m below the Whaleback Skarn (Figure 2b-d).

Core Assets' President & CEO Nick Rodway commented, "Our longest and highest-grade massive sulphide zinc intercepts were obtained during the 2024 drilling season. We've also successfully tapped quartz-sericite-pyrite zones and potassically altered porphyritic intrusions carrying Mo-Cu-Ag signatures at depth at Sulphide City. This impressive system remains open at depth and in multiple directions for exploration and is primed for additional discoveries. We look forward to presenting our surficial assay data in the coming weeks, as well as new structural interpretations for the Silver Lime Project."