Unlock stock picks and a broker-level newsfeed that powers Wall Street.
CopperCorp Commences Drilling at Jukes Cu-Au Prospect

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - September 11, 2024) - CopperCorp Resources Inc. (TSXV: CPER) (OTCQB: CPCPF) ("CopperCorp" or the "Company") is pleased to announce that it has commenced diamond drilling at the Jukes Zone target area (Jukes prospect) on its 100% owned Razorback Copper-Gold-REE property in western Tasmania, Australia.

Highlights

  • Diamond drilling has commenced at the Jukes prospect located 10km south of the Mt Lyell Cu-Au system (3Mt contained copper at 1% Cu, and 3Moz contained gold at 0.3g/t Au).

  • An initial 2-hole, 400m program will test depth extensions to structurally controlled high-grade Cu-Au mineralization at the Jukes prospect where results of recent channel sampling of underground historical workings included2:

    • 31.0m @ 1.48% Cu and 0.83g/t Au, including 9.0m @ 2.92% Cu and 1.79g/t Au

  • The planned program represents the first drilling at the Jukes prospect in almost 40 years.

Stephen Swatton, President and CEO of CopperCorp commented:
"We are excited to commence the drilling at Jukes as scheduled. This program coincides with the start of the Tasmanian summer in which the Company will step up work programs at several of its copper-gold targets located within the Razorback, southern end of Walford Peak and Linda South licenses. Over the past 2 months the Company has undertaken a comprehensive surface sampling program at Jukes, the results of which will be released over the next month. Sampling turnaround times in the assay laboratory for rock and drill samples are currently 2-3 weeks."

Sean Westbrook, Vice President of Exploration commented:
"Recent work by the exploration team has recognized that NNW-trending fault structures form an important control on high-grade Cu-Au mineralization at Jukes. This work therefore indicates strong geological similarities to the Mt Lyell Cu-Au system where orebodies sit adjacent to the N- to NNW-trending Great Lyell Fault. These first two shallow holes at Jukes will test this developing geological model whilst also providing important technical information that will assist refining of the model and inform planning of potential further drilling at the prospect."

Planned Drill Program

The planned drilling program comprises an initial 2 diamond drill holes totalling up to 400m. The drill holes are designed to target depth extensions to high-grade Cu-Au mineralization recently sampled2 in underground historical Jukes No. 3 Main Adit (31.0m @ 1.48% Cu and 0.83g/t Au, including 9.0m @ 2.92% Cu and 1.79g/t Au) and will test the current interpretation that these high-grade mineralized zones occur associated with NNW-trending fault structures, and in particular at the intersection of these structures with the NE-trending Jukes fault.


Waiting for permission
Allow microphone access to enable voice search

Try again.