TORONTO, ONTARIO--(Marketwired - Sep 16, 2013) - COASTAL GOLD CORP. (TSX VENTURE:COD)(COGGF)(CY41.F) (the "Company") announces initial results from the 2013 resource definition diamond drill program at its 100% owned Hope Brook Gold Project in southwestern Newfoundland. The first six holes, totalling 1,014 metres, have focussed on testing the newly developed "Footwall Target" (see press release August 6, 2013), where it appears that previous mining may have left significant higher grade mineralization in the footwall side of the stopes. Assay results have been received from the first two holes.
Drill Program Highlights:
-
Hole HB13-113 intersected high grade mineralization on the footwall of the 5015-170 stope grading 4.09 grams gold per tonne (g Au/t) over a core length of 13.5 metres (m).
-
Hole HB13-112, approximately 50m northeast of HB13-113, intersected 2.99 g Au/t over a core length of 10 metres in the footwall of the 5015-165 stope.
Dr. Bill Pearson, President and CEO of Coastal Gold, commented: "Our drill program is off to a strong start. Initial results have confirmed the presence of a significant thickness of higher grade mineralization in the footwall of stopes in the upper part of the former mine. We completed the program for the Footwall Target with five fewer holes than originally planned. The extra meterage has been re-allocated to expanding drilling on the SW Pit Extension target which is in progress.
Dr. Pearson further commented: "An important objective of this drill program is not only to expand the existing mineral resource but also to increase the overall grade. We hope to accomplish this by filling-in areas with limited previous drilling, redrilling certain historical holes that appear to have significantly underestimated grade and updating our geological interpretation. All of this work we believe will lead to a higher grade resource on which to base the PEA study in progress. The updated resource is expected to be completed by the end of this year and the PEA completed by early 2014."
To date, 2,127 m of drilling in 13 holes has been completed with assay results pending on 11 holes. The first six holes tested the Footwall target and the next seven holes are in the SW Pit Extension target as shown in Figures 1 and 2. Table 1 lists significant results and Table 2 gives collar location, orientation and depth information for all holes.
Table 1: List of significant assay results 2013 Drill Program - Hope Brook Gold Project. | |||||||
Hole No. | From (m) | To (m) | Core Length (m) | True Width (m) | Au (g/t) | Cu (%) | |
Footwall Target | |||||||
HB13-112 | 144.0 | 154.0 | 10.0 | 4.9 | 2.99 | 0.01 | |
incl. | 145.0 | 149.0 | 4.0 | 2.0 | 4.69 | 0.01 | |
HB13-113 | 150.1 | 163.6 | 13.5 | 6.3 | 4.09 | 0.04 | |
incl. | 155.1 | 163.6 | 8.5 | 4.0 | 5.42 | 0.04 |
Table 2: Drill hole locations and orientations - Hope Brook Gold Project. | ||||||||
Hole No. | UTM | Mine Grid | Elev. | Length | Az | Dip | ||
Easting | Northing | Easting | Northing | (i) | (ii) | (ii) | ||
HB13-112 | 418006 | 5287984 | 11656 | 5226 | 5142 | 159 | 145 | -44 |
HB13-113 | 418006 | 5287984 | 11656 | 5227 | 5142 | 215 | 145 | -50 |
HB13-114 | 418041 | 5288016 | 11702 | 5233 | 5146 | 163.6 | 145 | -44 |
HB13-115 | 418040 | 5288016 | 11702 | 5233 | 5146 | 172 | 145 | -52 |
HB13-116 | 418118 | 5288080 | 11802 | 5241 | 5148 | 166.4 | 145 | -41 |
HB13-117 | 418176 | 5288084 | 11853 | 5211 | 5149 | 138.2 | 145 | -49 |
HB13-118 | 417866 | 5287648 | 11348 | 5032 | 5125 | 213 | 325 | -80 |
HB13-119 | 417797 | 5287616 | 11273 | 5045 | 5121 | 73 | 325 | -45 |
HB13-120 | 417810 | 5287598 | 11273 | 5023 | 5121 | 136 | 325 | -57 |
HB13-121 | 417887 | 5287667 | 11377 | 5036 | 5125 | 232.8 | 325 | -78 |
HB13-122 | 417840 | 5287558 | 11275 | 4973 | 5118 | 199 | 325 | -63 |
HB13-123 | 417767 | 5287578 | 11227 | 5031 | 5117 | 86.8 | 325 | -45 |
HB13-124 | 417791 | 5287495 | 11199 | 4950 | 5122 | 172.2 | 325 | -55 |
Total | 2,127 | |||||||
Note: Assays are pending for holes HB13-114 to HB13-124 |
ABOUT COASTAL GOLD