Unlock stock picks and a broker-level newsfeed that powers Wall Street.

Class 1 Nickel Updates Resource Estimate on Dundonald North Nickel Sulphide Deposit – New Insights Into Significant Tonnage and Grade

In This Article:

Class 1 Nickel and Technologies Limited
Class 1 Nickel and Technologies Limited

TORONTO, March 27, 2025 (GLOBE NEWSWIRE) -- Class 1 Nickel and Technologies Ltd. (CSE: NICO | OTCQB: NICLF) ("Class 1 Nickel" or the "Company") is pleased to announce an updated mineral resource estimate (the “MRE”) for the Dundonald North Nickel Sulphide Deposit (the “D-N Deposit”) (Table 1 and Table 2). The D-N Deposit is one of 4 nickel sulphide deposits within the sizeable Alexo-Dundonald Nickel Sulphide Project (the “Project” or “A-D Project”) (Figure 1), covering about 3,093 hectares (30.93 km2) and located about 45 km northeast of the mining centre and City of Timmins, Ontario. Over the past two years, the Company has focused on a comprehensive effort to refine the Project’s mineral resource base, underscoring Class 1 Nickel’s commitment to build a robust portfolio of nickel sulphide resources in one of Canada’s premier mining districts (Class 1 news release 4 December 2024).

Highlights from the Dundonald North Nickel Sulphide Deposit:

  • Fully interpreted and robust 3D geological model forms the basis of the updated mineral resource estimate.

  • Out-of-Pit* Inferred Resources of 2.5 Mt at 0.75% Ni, 0.03% Cu, 0.02% Co (Table 1 and Table 2).

  • Represents a 31.4% increase in total tonnes with 3.5% increase in contained nickel (42 M lbs Ni), 74% increase in contained copper (2.6 M lbs Cu), and 40% increase in contained cobalt (1.2 M lbs Co).

  • Total 1.0% Ni Mineral Resources within the 4 A-D nickel deposits, using various %Ni cut-offs: 500 kt at 1.07% Ni Indicated and 1.0 Mt at 1.01% Ni Inferred (Table 3).

  • Total Mineral Resources within the 4 A-D nickel deposits using C$52.5/t and C$96.0/t NSR cut-offs: 3.4 Mt at 0.54% Ni Indicated and 6.6 Mt at 0.56% Ni Inferred (Table 4).

  • With 100% of the Dundonald North Deposit tonnes in the Inferred category there is excellent exploration upside to expand and upgrade resources through additional drilling.

  • Like the other 3 nickel deposits within the Project, the Dundonald North Deposit is open along strike and at depth, with new geological modelling and interpretation providing ample targets for next-stage drilling.

  • The Dundonald North and Dundonald South deposits have never been exploited and represent new exploration and development targets within the Alexo-Dundonald Nickel Sulphide Project.

*Pit optimization was not possible due to a lack of drill hole coverage over the mineralized area; Underground (Out-of-Pit) C$96.00/t NSR cut-off was applied to current mineral resource estimate whereas an underground C$90.00/t NSR was applied in the 2020 mineral resource estimate (Stone et al., 2020).