Cassiar Gold Encounters 19.7 metres of 6.84 g/t Gold through Expansion Drilling and Extends Mineralization from Surface with 201.8 metres of 0.53 g/t Gold

In This Article:

Calgary, Alberta--(Newsfile Corp. - January 16, 2025) - Cassiar Gold Corp. (TSXV: GLDC) (OTCQX: CGLCF) ("Cassiar Gold" or the "Company") is pleased to announce results from an additional seven diamond drill holes of the 2024 exploration program at the Cassiar Gold project, located in northern British Columbia. Results from these drill holes extend mineralization from surface at the southwest extent of the Taurus deposit with common occurrence of high-grade samples within broader intercepts. The 2024 drill program comprised 7,168 metres (m) of diamond drilling over 30 drill holes, geophysical surveys, mapping, and soil sampling at the Cassiar Gold Property. The results reported here are the final assay results from the Taurus deposit for 2024. Results are pending for three drill holes from the Newcoast prospect which lies 2.5 kilometres to the south.

Highlights:

Drill holes from the Taurus deposit reported here encountered significant intercepts above the 0.5 g/t Au cutoff of the 2022 Inferred Mineral Resource at Taurus1, with repeated occurrence of high-grade samples hosted within broader mineralized intervals. Results expand mineralization near surface and beyond the extent of the current resource block model.

Drilling intercepts are uncapped unless otherwise stated and represent apparent widths of mineralized zones. Drill hole composite intervals reported as 'capped' have undergone 1.5 m compositing and were subsequently capped at 20.00 g/t Au. A full summary of the latest results can be found in Table 1, and include:

  • 201.8 m of 0.53 grams per tonne (g/t) Gold (Au) from surface in drill hole 24TA-229

  • 19.7 m of 6.84 g/t Au (1.89 g/t Au capped), including 0.4 m of 315.00 g/t Au, in drill hole 24TA-232

  • Multiple intercepts returned in drill hole 24TA-234 include:

    • 16.5 m of 3.02 g/t Au from surface, including 0.5 m of 7.97 g/t Au and 5.0 m of 5.00 g/t Au

    • 22.3 m of 0.62 g/t Au

    • 10.3 m of 0.73 g/t Au, including 0.5 m of 6.56 g/t Au

  • Drill hole 24TA-235:

    • 4.3 m of 2.24 g/t Au from surface, and

    • 6.7 m of 0.95 g/t Au, including 0.4 m of 7.17 g/t Au

  • Drill hole 24TA-236:

    • 15.5 m of 0.71 g/t Au from surface, and

    • 21.9 m of 3.18 g/t Au (1.54 g/t capped), including 0.3 m of 184.50 g/t Au

  • Drill hole 24TA-237:

    • 34.7 m of 0.91 g/t Au from surface, including 2.7 m of 5.09 g/t Au

    • 6.1 m of 2.04 g/t Au including 1.0 m of 9.34 g/t Au

"These latest results expand the physical limits of the mineralized system from surface at the Taurus deposit and highlight the ongoing potential to identify higher-grade trends in the area of the bulk-tonnage resource," stated Jill Maxwell, VP Exploration. "We look forward to assessing the impact of these and previous results from our recent drill campaigns at Taurus to an updated mineral resource estimate in the first half of 2025," added Marco Roque, President and Chief Executive Officer.