Cartier Cuts High-Grade Intersection of 35.3 g/t Au over 4.4 m North of the Portal Zone on East Cadillac

In This Article:

Cartier Resources Inc.
Cartier Resources Inc.
2024 High-Grade Gold Results
2024 High-Grade Gold Results


VAL D'OR, Quebec, Nov. 20, 2024 (GLOBE NEWSWIRE) -- Cartier Resources Inc. (TSXV: ECR, FSE: 6CA) ("Cartier" or the "Company") reports high-grade gold results in the Portal sector at its 100%-owned East Cadillac property. The latter is located 45 km east of the Val-d’Or mining camp.

Highlights:

  • The drill holes intersected:

    • An intersection grading 241.0 g/t Au over 0.6 m included within 35.3 g/t Au over 4.4 m, 250  m north of the Portal Gold Zone (FIGURE and table 1 below);

    • Intersections grading 13.7 g/t Au over 0.5 m included within 4.7 g/t Au over 4.5 m and 5.9 g/t Au over 1.5 m, situated several meters from the Portal exploration ramp (Table 2 below);

  • The two drills, completing the 2024 exploration drilling program of 29,000 m (164 holes), have discovered to date 5 new high-grade gold zones on the East Cadillac property and exploration continues (FIGURE).

“ The results, obtained north of the Portal Zone, suggest the presence of a second high-grade gold structure in this area ” commented Philippe Cloutier, President and CEO.

Table 1: New Results from the Intersection North of the Portal Gold Zone

Hole

Coordinates
UTM (m)

Azimuth (°) /
Plunge (°)

From
(m)

To
(m)

Au
(g/t)

Length
(m)

CH24-197

330398/ 5320455/ 336

52/-56

166.3

166.9

241.0

0.6

Included within

164.3

168.7

35.3

4.4

The lengths of the mineralized intersections are expressed as measured lengths along the drill core.
The estimated true widths of the mineralized intersections are approximately 20% of the reported lengths.

Table 2: New Results from the Portal Gold Zone

Hole

Coordinates
UTM (m)

Azimuth (°) /
Plunge (°)

From
(m)

To
(m)

Au
(g/t)

Length
(m)

CH24-191

330299/ 5320411/ 337



182/-63

201.5

202.0

13.7

0.5

Included within

198.5

203.0

4.7

4.5

CH24-190

202/-73

217.1

218.6

5.9

1.5

The lengths of the mineralized intersections are expressed as measured lengths along the drill core.
The estimated true widths of the mineralized intersections are approximately 65% to 75% of the reported lengths.

Table 3: Portal Gold Zone Previous 2024 Results

Hole

Coordinates
UTM (m)

Azimuth (°) /
Plunge (°)

From
(m)

To
(m)

Au
(g/t)

Length
(m)

CH24-186

330304/ 5320309/ 337





161/-45





56.0

64.0

7.2

8.0

Including

56.0

58.0

11.0

2.0

and

62.0

64.0

12.5

2.0

and

62.0

62.5

26.2

0.5

CH24-188

330299/ 5320411/ 337

181/-46

153.8

154.3

7.2

0.5

The lengths of the mineralized intersections are expressed as measured lengths along the drill core.
The estimated true widths of the mineralized intersections are approximately 85% to 95% of the reported lengths.

Table 4: Best Historical Results from the Portal Gold Zone

Hole

Coordinates
UTM (m)

Azimuth (°) /
Plunge (°)

From
(m)

To
(m)

Au
(g/t)

Length
(m)

07-86-02

330267/ 5320398/ 336

180/-48

141.7

142.1

18.5

0.4

07-87-05

330326/ 5320268/ 337

180/-49

11.0

11.5

15.0

0.5

Included within

11.0

14.4

5.0

3.4

07-86-04

330269/ 5320556/ 335

180/-47

282.7

285.9

2.9

3.2

The lengths of the mineralized intersections are expressed as measured lengths along the drill core.
The estimated true widths of the mineralized intersections are approximately 85% to 95% of the reported lengths.