Cartier cuts 7.2 g/t Au over 8.0 m at the new Portal Zone on the East Cadillac Property

In This Article:

Cartier Resources Inc.
Cartier Resources Inc.
Figure 1
Figure 1


VAL-D’OR, Québec, Oct. 30, 2024 (GLOBE NEWSWIRE) -- Cartier Resources Inc. (TSXV: ECR, FSE: 6CA) ("Cartier" or the "Company") reports high-grade gold results from the new Portal Zone at its 100%-owned East Cadillac property. The latter is located 45 km east of the Val-d’Or mining camp.

Highlights

  • The 28,000-m (174 drill holes) ongoing exploration drill program continues to deliver high-grade gold results on the East Cadillac property (FIGURE).

  • Drilling intersected a new high-grade gold zone, located near surface and a few meters from the entrance to the Portal exploration Ramp (Tables 1 and 2 below):

    • 7.2 g/t Au over 8.0 m including 12.5 g/t Au / 2.0 m and 26.2 g/t Au / 0.5 m

  • Since March 5, 2024, drilling has discovered 5 new high-grade gold Zones on the East Cadillac property (FIGURE).

  • Two drill rigs continue to explore high-grade gold targets along the regional Larder Lake - Cadillac Fault Zone.

“The results from the Portal gold Zone confirm historical high-grade gold results” commented Philippe Cloutier, President and CEO, adding “in 2024, 5 high-grade gold zones have been discovered over 8 km of the Larder Lake - Cadillac Fault Zone, on the East Cadillac property.”

Table 1: Details of the new high-grade gold results of the new Portal Zone

Hole

Coordinates
UTM (m)

Azimuth (°) /
Plunge (°)

From
(m)

To
(m)

Au
(g/t)

Length
(m)

CH24-186

330304/5320309/337

161/-45

56.0

64.0

7.2

8.0

Including

56.0

58.0

11.0

2.0

And

62.0

64.0

12.5

2.0

And

62.0

62.5

26.2

0.5

CH24-188

330299/5320411/337

181/-46

153.8

154.3

7.2

0.5

 

 

 

 

 

 

 

The lengths of the mineralized intersections are expressed as measured lengths along the drill core.
The estimated true widths of the mineralized intersections are approximately 85 to 95% of the reported lengths.

Table 2: Details of the highest historical drill results of the new Portal Zone

Hole

Coordinates
UTM (m)

Azimuth (°) /
Plunge (°)

From
(m)

To
(m)

Au
(g/t)

Length
(m)

07-86-02

330267/5320398/336

180/-48

141.7

142.1

18.5

0.4

07-87-05

330326/5320268/337

180/-49

11.0

11.5

15.0

0.5

Included within

11.0

14.4

5.0

3.4

07-86-04

330269/5320556/335

180/-47

282.7

285.9

2.9

3.2

 

 

 

 

 

 

 

The lengths of the mineralized intersections are expressed as measured lengths along the drill core.
The estimated true widths of the mineralized intersections are approximately 85% to 95% of the reported lengths.

Quality Assurance / Quality Control

For each batch of samples sent to the laboratory, Cartier inserts 5% of the number of samples in the form of certified standards and another 5% in the form of blanks to ensure quality control. The samples are analyzed at the Techni-Lab (Actlabs) laboratory in Ste-Germaine-Boulé, Québec, Canada. Samples weighing 3 to 5 kg are crushed by the laboratory to 90% passing 10 mesh (2.00 mm), then a 500 g fraction of each sample is pulverized to 90% passing 200 mesh (0.07 mm). The resulting 50 g pulps are analyzed by fire assay with an atomic absorption finish. Samples with results ≥ 1.0 g/t and < 10.0 g/t are re-assayed by fire assay with an atomic absorption finish. Results greater than or equal to 10.0 g/t Au are analyzed by fire assay with a gravimetric finish. For samples containing visible gold, a 500 g subsample of rock is analyzed by the metallic sieve method.