Canter Resources Engages Cascade for Phase II Drilling at the Columbus Lithium-Boron Project

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - July 16, 2024) - Canter Resources Corp. (CSE: CRC) (OTC Pink: CNRCF)  (FSE: 6O1) ("Canter" or the "Company") is pleased to report that the Company has engaged Cascade Drilling LP for Phase II drilling at its Columbus Lithium-Boron Project ("Columbus", "Columbus Basin", or the "Project"), located near Tonopah, Nevada. The Phase II program will include approximately 10 holes with an expected start date of August 12, 2024.

"Our Phase II program has been designed to target a third aquifer zone below the limits of Phase I drilling, demonstrate lateral continuity between our Phase I grids and test regional discovery targets to the north," stated Canter CEO, Joness Lang. "The Phase II program will include select multi-element geochemical analysis, provide samples suitable for preliminary direct extraction considerations, further validate and refine our exploration model and deeper lithium targets, while concurrently assessing the extent and mineral resource potential of the significant near-surface boron mineralization."

Phase II Geoprobe Drilling Objectives:

  • Target third Aquifer Zone: Past downhole geophysics highlights the potential for a third shallow aquifer zone between 100-150 feet ("ft") / 30-45 metres ("m") and Phase II will employ a Geoprobe drill rig model and tooling with greater depth capabilities.

  • Demonstrate Lateral Continuity: Phase II drilling will include broadly spaced drill hole locations along pre-existing east-west road networks with the aim of demonstrating potential continuity within the five (5) kilometre ("km") gap between the previously completed north-south grids.

  • Test Discovery Potential to the North: The Phase II program includes two proposed wildcat exploration holes located more than 4 km to the north near favourable structure, surface sampling and geothermal input.

  • Enhance Precision of Deeper Lithium Targeting: Testing a third aquifer zone and completing multi-element geochemical analysis will further support the Company's 3D geological model, mineralization patterns in brines and mobility/solubility analysis.

  • Evaluate Shallow Boron Mineral Resource Potential: Phase I delivered excellent boron concentrations in brines from shallow aquifers and Phase II will aim to further delineate, correlate and map the extent of near-surface boron mineralization.

  • Establish Preliminary Direct Extraction Considerations: The Company is actively engaging with companies that specialize in direct lithium and boron extraction and plans to supply samples suitable for preliminary considerations.