Unlock stock picks and a broker-level newsfeed that powers Wall Street.

CANADIAN UTILITIES REPORTS THIRD QUARTER 2024 EARNINGS

In This Article:

CALGARY, AB, Nov. 14, 2024 /CNW/ - Canadian Utilities Limited (TSX: CU)

Canadian Utilities Q3 2024 release (CNW Group/Canadian Utilities Limited)
Canadian Utilities Q3 2024 release (CNW Group/Canadian Utilities Limited)

Canadian Utilities Limited (Canadian Utilities or the Company) today announced third quarter 2024 adjusted earnings of $102 million ($0.38 per share), which were $15 million ($0.06 per share) higher compared to $87 million ($0.32 per share) in the third quarter of 2023.

Third quarter earnings attributable to equity owners of the Company reported in accordance with International Financial Reporting Standards (IFRS earnings) were $12 million ($(0.03) per Class A and Class B share), which were $(113) million ($(0.42) per Class A and Class B share) lower compared to $125 million ($0.39 per Class A and Class B share) in the third quarter of 2023.

IFRS earnings include timing adjustments related to rate-regulated activities, unrealized gains or losses on mark-to-market forward and swap commodity contracts, one-time gains and losses, impairments, and items that are not in the normal course of business or a result of day-to-day operations. These items, as well as dividends on equity preferred shares of the Company, are not included in adjusted earnings.

RECENT DEVELOPMENTS

  • In September 2024, ATCO Energy Systems announced the filing of a comprehensive regulatory application that establishes the need for the Yellowhead Mainline natural gas project and represents the first of two applications to the Alberta Utilities Commission. This is a significant milestone for the advancement of the project. Subject to regulatory and company approvals, construction is expected to commence in 2026 and the pipeline is expected to be on-stream in the fourth quarter of 2027.

  • ATCO EnPower remains committed to hydrogen development within Alberta's Industrial Heartland and has signed a Letter of Intent with Linde Canada Inc. (Linde). ATCO EnPower and Linde are working alongside other parties to further the development and commercial success of the AH3 project, with the objective to commence Front End Engineering Design (FEED) in the fourth quarter of 2024 and advance both domestic and export offtake opportunities. The project has significant potential to supply hydrogen to domestic and international markets, including the Alberta gas grid, industrial, municipal, and commercial transport users. The parties continue to work with supportive Federal and Provincial governments to establish policy and frameworks that facilitate investment in the Canadian hydrogen economy of both export and domestic opportunities, and to work with First Nations for their participation in the development of and ownership in the project.

  • In September 2024, ATCO EnPower successfully produced hydrogen through two 1-MW electrolyzers that were constructed and commissioned in Edmonton and Calgary. This is a significant milestone for ATCO EnPower's partnership with Canadian Pacific Kansas City Limited that was announced in the second quarter of 2022, to provide engineering, procurement and construction services for two hydrogen production and refueling facilities in Calgary and Edmonton.

  • Subsequent to quarter end, on November 8, 2024, ATCO Gas Australia received the final AA6 decision from the Economic Regulation Authority (ERA). This final decision is a result of a constructive and collaborative regulatory process. The decision from the ERA approves the prices for ATCO Gas Australia's gas distribution network for the next five years. Their decision is underpinned by a five-year capital expenditure program, a five-year operating cost forecast, the demand forecast of throughput on the natural gas distribution network in Western Australia, and included an evaluation of the capital expenditure program completed during the AA5 period to confirm the capital expenditures met the regulatory criteria. The decision also determines the rate of return for the AA6 period, which adopts a ROE of 8.23 per cent, compared to 5.02 per cent in the previous Access Arrangement.

  • Incurred $414 million in capital expenditures in the third quarter of 2024, of which 94 per cent was invested in our regulated utilities in ATCO Energy Systems and ATCO Australia, and 6 per cent mainly in ATCO EnPower.