Brixton Metals Provides 2023 Summary and a 2024 Outlook

In This Article:

Brixton Metals Corporation
Brixton Metals Corporation

VANCOUVER, British Columbia, Jan. 10, 2024 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to provide a summary of the past year and an outlook for 2024.

Chairman and CEO Gary R. Thompson stated:Drilling at the Camp Creek copper porphyry target was successful in expanding the mineralization footprint significantly both on strike and to depth where it remains open for further expansion. We are looking forward to the 2024 drill season where we are targeting new discoveries on the massive Thorn Project and drill testing for the high-grade core of the Camp Creek porphyry.”

2023 Highlights

Camp Creek Copper Porphyry Target, Thorn Project (previously released)

  • 10,099.68m of drilling was completed from nine holes

  • Step-out drilling has expanded Cu-Au-Ag-Mo porphyry mineralization to a strike of 1050m and to a depth of 1650m in hole THN23-261 and molybdenum grade is increasing at depth

  • THN23-285 intersected 248m of 0.60% CuEq and 150.6m of 0.64% CuEq, and in addition to Cu-Mo porphyry mineralization, near-surface high-sulphidation veins yielded 10.4 g/t Au and 76.8 g/t Ag over 1.0m

  • THN23-261 returned 1562m of mineralization including 221m of 0.68% CuEq and 109.87m of 0.86% CuEq

  • Camp Creek drilling results ranked 15th on MinerDeck’s drilling highlights for 2023 global copper Intercepts

Trapper Gold Target, Thorn Project 6625m of drilling completed from 23 holes

  • Ten visible gold occurrences observed expanding the main zone along strike and at depth

  • Hole THN23-287 yielded 54.00m of 1.03 g/t Au, including 19.00m of 2.34 g/t Au

  • Hole THN23-288 yielded 76.50m of 1.08 g/t Au, including 6.00m of 4.58 g/t Au

  • THN23-270 yielded 98.00m of 0.62 g/t Au from 98.0m depth

    • Including 32.00m of 1.15 g/t Au

    • Including 6.00m of 5.07 g/t Au

  • A new copper showing was discovered with disseminated bornite at South Trapper located 5km south of the Trapper main drilling area and includes 6.5% and 5.3% Cu from rock grab samples

New Exploration Targets

A total of 1269 rocks, 1636 soils and 62 talus fine samples were collected across various target areas on the Thorn Project in 2023 which returned up to 33% copper, 52 g/t gold, and 5620 g/t silver. From the 1269 rock grab samples, 91 samples were greater than 1% copper, 20 samples were greater than 5% copper, 87 samples were greater than 1 g/t gold and 17 samples were greater than 10 g/t gold. New surface discoveries were achieved at historically worked zones, including the West Target, East Target, and Chivas, as well as at exciting new target areas such as Metla, North Target and South Target. Follow-up work is being planned for 2024 with the intent to drill test some of these target areas.