Brixton Metals Drills 3.00m of 5.67 g/t Gold within 48.50m of 1.16 g/t Gold at its Trapper Gold Target

In This Article:

Brixton Metals Corporation
Brixton Metals Corporation

VANCOUVER, British Columbia, Nov. 19, 2024 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce the final batch of 2024 drill results from the Trapper Gold Target at its wholly owned Thorn Project. The project is located in Northwest British Columbia, 90km east of Juneau, Alaska.

Highlights

  • Hole THN24-311 yielded 48.50m of 1.16 g/t Gold from 73.00m depth

    • Including 20.00m of 2.34 g/t Gold

    • Including 3.00m of 5.67 g/t Gold

  • Hole THN24-310 yielded 42.00m of 0.61 g/t Au Including 9.00m of 1.16 g/t Gold

  • Gold occurs as native gold and is associated with base metal veins as galena, sphalerite, chalcopyrite, quartz-carbonate and pyrite

The 2024 Trapper Gold drill program continued to demonstrate the strong mineralization potential of the target. The Trapper Target remains open in multiple directions and with supporting geochemical, geophysical and structural data, several promising areas for potential expansion have been identified. We look forward to drilling at the Trapper Target in 2025,” stated Vice President of Exploration, Christina Anstey.

Figure 1. Gold Geochemistry and Trapper Target Location Map.

Figure 1_19Nov2024
Figure 1_19Nov2024


Table 1. Select Mineralized Intervals for the Trapper Target Drilling.

Hole ID

From (m)

To (m)

Interval (m)

Au (g/t)

Ag (g/t)

THN24-310

16.00

158.00

142.00

0.49

2.05

Including

34.00

76.00

42.00

0.61

1.78

Including

53.00

62.00

9.00

1.16

3.02

And Including

123.00

158.00

35.00

0.67

2.07

Including

125.00

132.00

7.00

1.10

3.19

THN24-311

6.00

132.00

126.00

0.58

2.61

Including

73.00

121.50

48.50

1.16

3.92

Including

73.00

93.00

20.00

2.34

7.21

Including

80.00

93.00

13.00

2.94

9.19

Including

80.00

83.00

3.00

5.67

7.04


All assay values are uncut weighted averages and intervals reflect drilled lengths as further drilling is required to determine the true widths of the mineralization.

Discussion

The 2024 drill campaign at the Trapper Gold Target totaled 2,745.60m of drilling across 11 HQ-sized diamond drill holes, of which 685.00m are covered in this release. The program was designed to test the extents and continuity of the main mineralized corridor along the Lawless Fault zone through a combination of infill and step-out drilling. Additional step-out drilling was completed north of the main zone, following-up on undercover mineralized zones that were identified during the 2023 drill program. Drilling was planned through a combination of mapping, oriented core data analysis, geophysics, and soil geochemistry. This release covers all remaining drill hole results from the 2024 Trapper Gold Target drill campaign.

Figure 2. Planview Map with Collar Locations and Gold Drill Traces at the Trapper Target.