Bravo's Luanga PGM+Au+Ni Deposit Continues to Deliver Significant Mineralized Grades & Thicknesses

In This Article:

Highlights include 21m at 9.34g/t PGM+Au, 116m at 1.59g/t PGM+Au,
5m at 16.40g/t PGM+Au, and 42m at 2.41g/t PGM+Au, 0.12% Ni

VANCOUVER, BC, Nov. 5, 2024 /CNW/ - Bravo Mining Corp. (TSXV: BRVO) (OTCQX: BRVMF), ("Bravo" or the "Company") received assay results from twenty-five diamond drill holes ("DDH") from its 100% owned Luanga palladium + platinum + rhodium + gold + nickel deposit ("Luanga deposit" or "Luanga PGM+Au+Ni deposit"), located in the Carajás Mineral Province, state of Pará, Brazil.

"Today's drilling results mark another step forward as Bravo progresses towards completing the 2024 PGM definition drilling program to support future MRE updates. These results continue to intercept high grades over thick intersections, including those in the Oxide and Low Sulphide zones that have high platinum to palladium ratios.", said Luis Azevedo, Chairman and CEO. "The Luanga Project's consistent delivery of robust results and advancements across various potential development tracks solidify its position as a leading candidate to become a major new Western supplier of these essential metals through market cycles and away from sources affected by geopolitical risks and deep operational challenges. The Project's potential benefits from the substantial infrastructure of the Carajás District, including cost-effective hydro power as well as ready access to power lines, highways, rail, water, labour, and suppliers."

Highlights Include:

  • Infill and extensional drilling in the Central Sector continue to reveal improved mineralized grades and thicknesses as compared to previous 100m spaced sections.

  • Much of the mineralization intersected in the new drilling lies within 150m of surface and remains open for further extension to depth.

  • Drilling in the North Sector of the Luanga deposit continues to demonstrate high-grade supergene mineralization in the oxide zone (e.g. 21m at 9.34g/t PGM+Au in DDH24LU264) and wide zones of mineralization in the fresh rock (e.g. 116m at 1.59g/t PGM+Au in DDH24LU266).

  • Drilling at T5 target continues to extend mineralization eastward. Testing of the Bore Hole Electromagnetic ("BHEM") anomaly at T1 will commence soon, as well as drill testing of a new copper/gold target west of T5.

HOLE-ID

From

(m)

To

(m)

Thickness (m)

Pd

Pt

Rh

Au

PGM + Au

Ni* (%) Sulphide

TYPE

Sector

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

DDH24LU264

0.00

21.00

21.00

1.05

8.14

0.08

0.07

9.34

NA

Ox

North

DDH24LU265

128.30

164.60

36.30

0.45

1.36

0.04

0.01

1.87

0.01

FR/LS

North

And

201.60

228.60

27.00

1.64

0.93

0.18

0.04

2.78

0.07

FR

North

DDH24LU266

29.70

146.00

116.30

0.54

1.01

0.03

0.01

1.59

0.02

FR

North

DDH24LU269

49.65

54.65

5.00

10.46

5.09

0.77

0.08

16.40

0.04

FR

Central

DDH24LU271

69.20

81.20

12.00

2.09

0.92

0.14

0.01

3.16

0.12

FR

Central

DDH24LU275

25.80

46.90

21.10

2.34

0.81

0.15

0.03

3.33

0.10

FR

Central

DDH24LU277

86.90

89.90

3.00

22.13

8.56

1.01

0.06

31.65

0.03

FR

Central

And

175.90

179.90

4.00

3.21

13.93

0.62

0.01

17.77

0.02

FR/LS

Central

DDH24LU278

23.00

27.00

4.00

4.13

2.18

0.31

0.03

6.64

0.02

FR

Central

DDH24LU280

150.50

184.50

34.00

1.71

0.56

0.08

0.17

2.52

0.29

FR

Central

DDH24LU281

102.80

142.80

40.00

1.43

0.51

0.07

0.14

2.16

0.23

FR

Central

DDH24LU282

170.65

213.30

42.65

1.67

0.61

0.09

0.04

2.41

0.28

FR

Central

Notes: All 'From', 'To' depths, and 'Thicknesses' are downhole. 'NA' Not applicable for Oxide material. Given the orientation of drilling and mineralization, intercepts are estimated at 115% to 135% of true thickness in the Central Sector, and 135% to 155% of true thickness in the North Sector. Type: Ox = Oxide. FR = Fresh Rock. LS = Low Sulphide. Recovery methods and results will differ based on the type of mineralization. * Bravo's nickel grades are sulphide nickel, and do not include non-recoverable silicate nickel, unlike historical total nickel assays.

Luanga Drilling Update

Results from twenty-five diamond drill holes have been received, eight from the North Sector and seventeen from the Central Sector of the Luanga PGM+Au+Ni deposit. All the drill holes reported herein are angled holes (-60 degrees), towards an azimuth of 090° in the North Sector and 330° in the Central sector. Together, this set of drill holes comprise a total of 4,994.6 metres of diamond drilling.