Bonterra Intersects Near-Surface Mineralization Near Its Bachelor Mill Complex at Its 100% Owned Desmaraisville South Project

In This Article:

Val-d'Or, Quebec--(Newsfile Corp. - December 17, 2024) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2) ("Bonterra" or the "Company") is pleased to announce initial assay results from its 4,761 meters ("m") diamond drilling campaign at its 100% owned Desmaraisville South Project ("the Project"). The campaign aimed to test several new targets, focusing on: (1) observations from the 2024 fieldwork campaign, (2) follow-up on promising gold-mineralized environments identified in the 16,000 m fall 2023 drill campaign, (3) newly identified geophysical IP targets within the Opawica-Guercheville regional deformation corridor, and (4) the near-surface extension of the Hewfran gold mineralized zone.

All drill holes are located within 5 kilometers ("km") of the Bachelor Mill Complex, ranging from near surface to a depth of less than 300 m. One drill hole, BRDS-24-072, was drilled on the Nelligan joint venture ("Nelligan JV") in partnership with O3 Mining Inc. (now Agnico Eagle Mines Ltd or "Agnico") where Bonterra holds a 70% interest in the Nelligan JV (see O3 Mining press release dated December 12, 2024, for more details on the acquisition by Agnico). The Nelligan JV covers an area equivalent to approximately 15% of the Project.

Marc-André Pelletier, President and CEO commented: "This year's exploration efforts have led to the discovery of four new mineralized zones within 5 km of our 100% owned Bachelor Mill Complex on the Desmaraisville property. These zones are near surface, exhibit extensive widths of mineralized material suitable for mining, and will be prioritized for future follow-up work. With significant potential for additional discoveries, we remain committed to actively exploring the property, leveraging the benefits of innovative technologies like VRIFY's AI-assisted mineral discovery platform. Furthermore, we are excited to welcome Agnico Eagle as a partner following the transaction with O3 Mining, and we look forward to collaborating on the Nelligan JV with our new partner."

The campaign consisted of 16 diamond drill holes completed between August to November 2024. A total of 2,500 diamond drill core (NQ) samples, along with 408 Quality Assurance and Quality Control ("QA/QC") samples, were submitted to various laboratories. To date, 682 analytical results remain pending.

Highlights Include:

  • 1.13 g/t Au over 16.0 m, including 2.02 g/t Au over 6.0 m in hole BRDS-24-063

  • 5.30 g/t Au over 1.4 m, including 18.39 g/t Au over 0.4 m in hole BRDS-24-060

  • 2.58 g/t Au over 6.0 m, including 4.50 g/t Au over 3.2 m in hole BRDS-24-065

  • 0.59 g/t Au over 22.3 m, including 3.17 g/t Au over 2.4 m in hole BRDS-24-066