Bluestone Announces Additional Drill Results - 3.3 meters of 27.9 g/t Au and 260 g/t Ag at Cerro Blanco

Vancouver, British Columbia--(Newsfile Corp. - February 7, 2019) - Bluestone Resources Inc. (TSXV: BSR) (OTCQB: BBSRF) ("Bluestone" or the "Company") is pleased to announce additional infill drill results from resource conversion drilling underway at its high-grade Cerro Blanco Gold project. The focus of the ongoing infill drill program is to upgrade the Inferred Resources into Measured and Indicated Resources.

Bluestone recently announced results of a Feasibility Study on the high-grade Cerro Blanco Gold project (see press release January 29, 2019) where one of the principal recommendations for optimizing and further enhancing the project was through potential conversion of a portion of the 360,000 ounces of Inferred Resources to Measured and Indicated Resources through infill drilling (currently ongoing), which will be followed by an updated mineral resource and mine plan.

Two LM-75 diamond drill rigs are currently situated within the North Zone of the Cerro Blanco underground workings and are targeting specific veins in the upper part of the Cerro Blanco resource that can be converted to the Indicated Resource category by infill drilling.

The primary focus of the program is to upgrade the Inferred Resources identified during the previous infill drill program completed in 2018. In addition, this program is also designed to define new resources along known veins in the mine plan that extend outside of the current resource envelope.

Table 1. Significant Intercepts

HOLE ID

FROM
(meters)

TO
(meters)

CORE
INTERVAL

TRUE
WIDTH

Au g/t

Ag g/t

VEIN ID

UGCB18-107

Results Pending

UGCB18-108

Results Pending

UGCB18-109

33.7

34.7

1.0

1.0

8.5

P

New

 

80.2

81.38

1.2

1.2

5.1

83

VN_01

 

86.0

87.1

1.1

1.1

4.8

44

-

 

95.85

99.1

3.3

3.3

27.9

260

VN_02

UGCB18-110

33.7

34.74

1.0

1.0

19.9

170

New

 

108.4

110.4

2.0

2.0

10.0

113

VN_02

 

113.1

114.1

1.0

1.0

18.3

97

VN_03

 

Notes: Intervals in bold are cited in the text of the news release. A complete table with hole coordinates and azimuth/dip information accompany the plan view attached to this release. P - Results pending

David Cass, Vice President of Exploration commented, "The infill drilling program has been designed to strategically target key veins with upgrading resource categories. To date, the program has had an excellent success rate with every key intercept expected to have a positive impact on future project economics, with intercepted veins showing remarkable consistency and continuity, validated by optimum hole orientations reflected in the drilled true widths."