Bam Bam Signs Contract with Core Driller for Springtime Drilling at Majuba Hill Copper-Gold Porphyry, Nevada

In This Article:

Vancouver, British Columbia--(Newsfile Corp. - March 17, 2022) - Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") is pleased to have signed a core drilling contract with Falcon Drilling, Inc. for the Majuba Hill Project in Pershing County Nevada. Falcon drilled at Majuba in 2020 and 2021. Drilling is planned to begin in mid-April.



Figure 1

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/6332/117129_f8250c5fc40dc92b_001full.jpg

Approximately 4,000 meters (13,000 ft) is planned to drill deeper holes below the copper enriched Known Copper Oxide Zone and to extend the granodiorite footprint discovered in the Copper-Gold Target area.

David Greenway, President and CEO, commented: "This is a key development phase for Majuba Hill. I expect these deeper holes to expand the copper mineralization footprint and signify that Majuba can be a very significant source for world copper demands."

Project Infrastructure and Development

Copper mineralization at Majuba is centered within a large contiguous land position. Bam Bam has 100% control of the emerging Majuba Hill Copper District by private surface and mineral ownership, patented mining claims, and Federal Lode Mining claims. The property is in Nevada, a Tier 1 mining district that is the most mining friendly place in North America and has well developed transportation, power, and workforce infrastructure.

Majuba is easily reached by 23 miles of well-maintained roads leading from U.S. Interstate 80. The existing highways are sufficient for transportation of exploration-size heavy equipment. The Company has engaged EM Strategies-A Westland Resources Inc. Company provide long-range environmental planning services. Development logistics can use the 4 lane Interstate 80 highway, Union Pacific railroad tracks and power, natural gas, and fiber optic transmission lines in the rail - highway corridor.

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has a QA/QC program using best industry practices in place at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps.